m |
m |
||
Line 1: | Line 1: | ||
This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site. | This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site. | ||
− | {{alert| | + | {{alert|INFORMATION ON USING THE FLOW CHART SEQUENCE: |
+ | *when you click on an answer (Yes or No), the next question in the sequence will be at the top of the page. | ||
+ | *if a decision point is reached (a performance goal or FTO is determined), there will be a blue alert box and a message saying you have completed the flow chart sequence. | ||
+ | *solid lines separate different questions in the sequence. Remember the next question in your sequence is at the top of the page. | ||
+ | |alert-info}} | ||
==Preliminary information== | ==Preliminary information== | ||
Line 42: | Line 46: | ||
{{alert|The MIDS performance goal does not apply|alert-info}} | {{alert|The MIDS performance goal does not apply|alert-info}} | ||
− | <FONT SIZE=5> | + | <FONT SIZE=5>YOU HAVE COMPLETED THE FLOW CHART<br> |
_____________________________________________________</font size> | _____________________________________________________</font size> | ||
Line 73: | Line 77: | ||
{{alert|Select FTO Alternative 2. Provide documentation of off-site run-on to project area. Provide documentation of lack of ROW|alert-info}} | {{alert|Select FTO Alternative 2. Provide documentation of off-site run-on to project area. Provide documentation of lack of ROW|alert-info}} | ||
− | <font size=5> | + | <font size=5>YOU HAVE COMPLETED THE FLOW CHART<br> |
_________________________________________________________</font size> | _________________________________________________________</font size> | ||
Line 79: | Line 83: | ||
{{alert|Provide soil survey, maps, regulations, and/or cost estimates documenting that meeting the original performance goal or FTO alternatives is not feasible in addition to other documentation as required by LGU|alert-info}} | {{alert|Provide soil survey, maps, regulations, and/or cost estimates documenting that meeting the original performance goal or FTO alternatives is not feasible in addition to other documentation as required by LGU|alert-info}} | ||
− | <font size=5> | + | <font size=5>YOU HAVE COMPLETED THE FLOW CHART<br> |
_________________________________________________________</font size> | _________________________________________________________</font size> | ||
This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
Prior to using the flow chart, gather the following preliminary information.
YOU HAVE COMPLETED THE FLOW CHART
_____________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
YOU HAVE COMPLETED THE FLOW CHART
_________________________________________________________
YOU HAVE COMPLETED THE FLOW CHART
_________________________________________________________
Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive?
Is BMP relocation possible?
Are Flexible Treatment Option Alternatives number 1 or number 2 feasible?
Investigate Off-Site Considerations:
Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal or FTO Alternatives
END