(Created page with "<table class="sortable"> <tr><th>PSH Operation</th> <th>Polluting Activity</th> </tr> <tr> <td>Vehicle Operations</td> <td> *Improper disposal of fluids down shop and storm dr...")
 
Line 73: Line 73:
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
 +
 +
= This is a test of the checklist format =
 +
 +
== BIORETENTION - Construction Inspection Checklist ==
 +
 +
<table border="1">
 +
<tr>
 +
  <td width="800">Project: </td>
 +
</tr>
 +
<tr>
 +
  <td>Location: </td>
 +
</tr>
 +
<tr>
 +
  <td>Site Status: </td>
 +
</tr>
 +
<tr>
 +
  <td>Date: </td>
 +
</tr>
 +
<tr>
 +
  <td>Time: </td>
 +
</tr>
 +
<tr>
 +
  <td>Inspector: </td>
 +
</tr>
 +
  </table>
 +
  <br>
 +
<table border="1">
 +
  <tr>
 +
    <th width="200">Construction Sequence</th>
 +
    <th>Satisfactory/ Unsatisfacroty</th>
 +
    <th width="400">Comments</th>
 +
  </tr>
 +
  <tr>
 +
    <td bgcolor="D0D0D0" colspan="3">1. Pre Construction</td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">Pre Construction Meeting</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">Runoff diverted</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">Facility area cleared</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">Soil tested for permibility</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">Project benchmark near site</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr> 
 +
  <tr>
 +
    <td width="200">facility location staked out</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">Temporary erosion and sedimant protection properly installed</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  <tr>
 +
    <td bgcolor="D0D0D0" colspan="3">2. Excavation</td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">lateral slopes completly level</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">Soils not compacted durring excavation</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">Longitudinal slopes within design range</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  <tr>
 +
    <td width="200">Stockpile location not  adjacent to excavation area and stablized with vegitation and/or silt fence</td>
 +
    <td>- </td>
 +
    <td>- </td>
 +
  </tr>
 +
  </table>

Revision as of 17:08, 18 December 2012

PSH Operation Polluting Activity
Vehicle Operations
  • Improper disposal of fluids down shop and storm drains
  • Spilled fuel, leaks and drips from wrecked vehicles
  • Hosing of ourdoor work areas*Wash water from cleaning
  • Uncovered outdoor storage of liquids/oils/batteries spills
  • Pollutant wash-off from parking lot
Outdoor Materials
  • Spills at loading areas
  • Hosing/washing of loading areas into shop or storm drains
  • Wash-off of uncovered bulk materials and liquids stored outside, of particular concern in MN are road salt storage areas
  • Leaks and spills
Waste Management
  • Spills and leaks of liquids
  • Dumping into storm drains
  • Leaking dumpsters (Dumpster juice)
  • Wash-off of dumpster spillage
  • Accumulation of particulate deposits
Physical Plant Maintenance
  • Discharges from power washing and steam cleaning
  • Wash-off of fine particles from painting/sandblasting operations
  • Rinse water and wash water discharges during cleanup
  • Temporary outdoor storage
  • Runoff from degreasing and re-surfacing
Turf and Landscaping
  • Non-target irrigation
  • Runoff of nutrients and pesticides
  • Deposition and subsequent washoff of soil and organic matter on impervious surfaces
  • Improper rinsing of fertilizer/pesticide applicators
Unique PSH Operations (Pools, Golf Courses, Marinas, Construciton, Restaurants, Hobby Famrs)

Varies but includes:

  • Discharge of chlorinated water from pools
  • Improper disposal of sewage and grease
  • Wash off of livestock manure
  • Soil erosion
  • Runooff of pesticides
  • Salt storage
Image Example 200px
Empty Circle
Quarter Circle
Half Circle
Full Circle


This is a test of the checklist format

BIORETENTION - Construction Inspection Checklist

Project:
Location:
Site Status:
Date:
Time:
Inspector:
 
Construction Sequence Satisfactory/ Unsatisfacroty Comments
1. Pre Construction
Pre Construction Meeting - -
Runoff diverted - -
Facility area cleared - -
Soil tested for permibility - -
Project benchmark near site - -
facility location staked out - -
Temporary erosion and sedimant protection properly installed - -
2. Excavation
lateral slopes completly level - -
Soils not compacted durring excavation - -
Longitudinal slopes within design range - -
Stockpile location not adjacent to excavation area and stablized with vegitation and/or silt fence - -