m
m
Line 22: Line 22:
 
*[[Bioretention terminology]] (including types of bioretention)
 
*[[Bioretention terminology]] (including types of bioretention)
 
*[[Overview for bioretention]]
 
*[[Overview for bioretention]]
<!--*[[Types of bioretention]]-->
+
 
 
*[[Design criteria for bioretention]]
 
*[[Design criteria for bioretention]]
 
*[[Construction specifications for bioretention]]
 
*[[Construction specifications for bioretention]]
Line 32: Line 32:
 
*[[External resources for bioretention]]
 
*[[External resources for bioretention]]
 
*[[References for bioretention]]
 
*[[References for bioretention]]
<!--*[[Requirements, recommendations and information for using bioretention BMPs in the MIDS calculator]]-->
 
 
*[[Requirements, recommendations and information for using bioretention with no underdrain BMPs in the MIDS calculator]]
 
*[[Requirements, recommendations and information for using bioretention with no underdrain BMPs in the MIDS calculator]]
 
*[[Requirements, recommendations and information for using bioretention with an underdrain BMPs in the MIDS calculator]]
 
*[[Requirements, recommendations and information for using bioretention with an underdrain BMPs in the MIDS calculator]]
Line 39: Line 38:
  
 
<!--
 
<!--
 +
*[[Types of bioretention]]
 
*[[Construction observations for bioretention]]
 
*[[Construction observations for bioretention]]
 
*[[Assessing the performance of bioretention]]
 
*[[Assessing the performance of bioretention]]
 
*[[Calculating credits for bioretention]][[Additional considerations for bioretention]]
 
*[[Calculating credits for bioretention]][[Additional considerations for bioretention]]
 
*[[Links for bioretention]]
 
*[[Links for bioretention]]
-->
+
*[[Bioretention fact sheets]]
 
 
 
 
<!--THIS IS THE PROPOSED OUTLINE
 
*[[Bioretention terminology]]
 
*[[Overview for bioretention]]
 
*[[Types of bioretention]]
 
*[[Cost-benefit considerations for bioretention]]
 
*[[Supporting material for bioretention]]
 
*[[External resources for bioretention]]
 
*[[References for bioretention]]
 
 
*[[Requirements, recommendations and information for using bioretention BMPs in the MIDS calculator]]
 
*[[Requirements, recommendations and information for using bioretention BMPs in the MIDS calculator]]
 
[[Bioretention - bioinfiltration]]
 
*[[Design criteria for bioinfiltration]]
 
*[[Construction specifications for bioinfiltration]]
 
*[[Operation and maintenance of bioinfiltration]]
 
*[[Assessing the performance of bioinfiltration]]
 
*[[Calculating credits for bioinfiltration]]
 
 
[[Bioretention - biofiltration]]
 
*[[Design criteria for biofiltration]]
 
*[[Construction specifications for biofiltration]]
 
*[[Operation and maintenance of biofiltration]]
 
*[[Assessing the performance of biofiltration]]
 
*[[Calculating credits for biofiltration]]
 
-->
 
 
<!--
 
[[Bioretention fact sheets]]<br>
 
[[Supporting material for bioretention]]
 
 
-->
 
-->

Revision as of 21:00, 18 September 2014


image of Minimal Impact Design Standards logo
photo of a rain garden
A raingarden in a commercial development, Stillwater, Minnesota.
Information: Bioretention practices are commonly called rain gardens
Green Infrastructure: Bioretention practices can be an important tool for retention and detention of stormwater runoff. Because they utilize vegetation, bioretention practices provide additional benefits, including cleaner air, carbon sequestration, improved biological habitat, and aesthetic value.

Bioretention is a terrestrial-based (up-land as opposed to wetland) water quality and water quantity control process. Bioretention employs a simplistic, site-integrated design that provides opportunity for runoff infiltration, filtration, storage, and water uptake by vegetation.

Bioretention areas are suitable stormwater treatment practices for all land uses, as long as the contributing drainage area is appropriate for the size of the facility. Common bioretention opportunities include landscaping islands, cul-de-sacs, parking lot margins, commercial setbacks, open space, rooftop drainage and street-scapes (i.e., between the curb and sidewalk). Bioretention, when designed with an underdrain and liner, is also a good design option for treating potential stormwater hotspots (PSHs). Bioretention is extremely versatile because of its ability to be incorporated into landscaped areas. The versatility of the practice also allows for bioretention areas to be frequently employed as stormwater retrofits.


The individual articles comprising this section on bioretention may be viewed as a single article. Note: Due to an unresolved bug, when viewing a formula in a combined article, the math markup (used for equations) is displayed. Thanks.


Acknowledgements

Bioretention articles

Green Infrastructure: bioretention facilities are designed to mimic a site's natural hydrology