**'''Underlying soil - Hydrologic Soil Group:''' The user selects the most restrictive soil (lowest hydraulic conductivity) within the 3 feet below the media/native soil interface of the bioinfiltration basin. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (HSG) A, B, C, or D) for the user. Once a soil type is selected, the corresponding [[Design infiltration rates|infiltration rate]] will populate in the ''Infiltration rate of underlying soils'' field. The user may also select ''User Defined''. This selection will activate the ''User Defined Infiltration Rate'' cell allowing the user to enter a different value from those in the predefined selection list. The maximum allowable infiltration rate is 1.63 inches per hour. | **'''Underlying soil - Hydrologic Soil Group:''' The user selects the most restrictive soil (lowest hydraulic conductivity) within the 3 feet below the media/native soil interface of the bioinfiltration basin. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (HSG) A, B, C, or D) for the user. Once a soil type is selected, the corresponding [[Design infiltration rates|infiltration rate]] will populate in the ''Infiltration rate of underlying soils'' field. The user may also select ''User Defined''. This selection will activate the ''User Defined Infiltration Rate'' cell allowing the user to enter a different value from those in the predefined selection list. The maximum allowable infiltration rate is 1.63 inches per hour. | ||
**'''Required drawdown time (hrs):''' This is the time in which the stormwater captured by and ponded within the BMP must drain into the underlying soil/media. The user must select from predefined values of 48 or 24 hours. The [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html MPCA Construction Stormwater General Permit] requires drawdown within 48 hours, but 24 hours is ''Highly Recommended'' when discharges are to a [[Sensitive waters and other receiving waters |trout stream]]. The calculator uses the ''Infiltration rate of underlying soils'' and the ''Overflow depth (D<sub>O</sub>)'' to check if the BMP is meeting the drawdown time requirement. The user will encounter an error and be required to enter a new ''Overflow depth (D<sub>O</sub>)'' if the stormwater stored in the BMP cannot drawdown in the required time. | **'''Required drawdown time (hrs):''' This is the time in which the stormwater captured by and ponded within the BMP must drain into the underlying soil/media. The user must select from predefined values of 48 or 24 hours. The [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html MPCA Construction Stormwater General Permit] requires drawdown within 48 hours, but 24 hours is ''Highly Recommended'' when discharges are to a [[Sensitive waters and other receiving waters |trout stream]]. The calculator uses the ''Infiltration rate of underlying soils'' and the ''Overflow depth (D<sub>O</sub>)'' to check if the BMP is meeting the drawdown time requirement. The user will encounter an error and be required to enter a new ''Overflow depth (D<sub>O</sub>)'' if the stormwater stored in the BMP cannot drawdown in the required time. | ||
− | *'''BMP Summary | + | *'''BMP Summary tab''': The BMP Summary tab summarizes the volume and pollutant reductions provided by the specific BMP. It details the performance goal volume reductions and annual average volume, dissolved P, particulate P, and TSS load reductions. Included in the summary are the total volume and pollutant loads received by the BMP from its direct watershed, from upstream BMPs, and a combined value of the two. Also included in the summary are the total volume and pollutant load reductions provided by the BMP, along with the volume and pollutant loads that exit the BMP through the outflow. This outflow load and volume is what is routed to the downstream BMP, if one is defined in the ''Watershed'' tab. Finally, percent reductions are provided for the percent of the performance goal achieved, percent annual runoff volume retained, total percent annual particulate phosphorus reduction, total percent annual dissolved phosphorus reduction, total percent annual TP reduction, and total percent annual TSS reduction. |
==Model input requirements and recommendations== | ==Model input requirements and recommendations== | ||
Line 39: | Line 39: | ||
==Methodology== | ==Methodology== | ||
− | ===Required | + | ===Required treatment volume=== |
''Required treatment volume,'' or the volume of stormwater runoff delivered to the BMP, equals the performance goal ([[Performance goals for new development, re-development and linear projects|1.1 inches for MIDS]] or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously following the [http://www.stormh2o.com/SW/Articles/Kerplunk_15253.aspx Kerplunk method]. | ''Required treatment volume,'' or the volume of stormwater runoff delivered to the BMP, equals the performance goal ([[Performance goals for new development, re-development and linear projects|1.1 inches for MIDS]] or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously following the [http://www.stormh2o.com/SW/Articles/Kerplunk_15253.aspx Kerplunk method]. | ||
− | ===Volume | + | ===Volume reduction capacity of BMP (V) and comparison with performance goal=== |
− | + | For this BMP, the ''Volume reduction capacity of BMP (V)'' is equal to the amount of stormwater that can be instantaneously captured above the media and below the overflow point that will infiltrate into the underling soil/media within the required drawdown time. The ''Volume reduction capacity of BMP (V)'' is calculated with user-provided inputs, and is given by | |
<math>V = ((A_O + A_M) / 2) * D_O</math> | <math>V = ((A_O + A_M) / 2) * D_O</math> | ||
Line 52: | Line 52: | ||
:D<sub>O</sub> is the overflow depth (ft). | :D<sub>O</sub> is the overflow depth (ft). | ||
− | The ''Volume of | + | The MIDS calculator compares the ''Volume reduction capacity of BMP [V]'' with the ''Required treatment volume'', and the lesser of the two values is used to populate the ''Volume of retention provided by BMP''. This comparison between potential and actual treatment volumes ensures that the BMP does not claim more credit than is due based on the actual amount of water routed to it. The ''Volume of retention provided by BMP'' is the actual volume credit the BMP receives toward the instantaneous performance goal. For example, if the BMP is oversized the user will only receive volume credit for the ''Required treatment volume'' routed to the BMP. |
− | ==Pollutant Reduction== | + | Annual volume retention is assessed by converting the instantaneous ''Volume reduction capacity of BMP [V]'' to an annual volume reduction percentage. This is accomplished through the use of [[Performance curves for MIDS calculator|performance curves]] developed from a range of modeling scenarios. These performance curves use the ''Volume reduction capacity of BMP [V]'', the [[Design infiltration rates|infiltration rate]] of the underlying soils, the percent imperviousness of the contributing watershed area, and the size of the contributing watershed to calculate the ''Percent annual runoff volume retained'' and annual ''Retention volume provided by BMP''. |
+ | |||
+ | ===Pollutant Reduction=== | ||
[[File:Bioinfiltration pollutant treatment.jpg|thumb|300px|alt=schematic showing how pollutants are treated by bioinfiltration in MIDS calculator|<font size=3>Schematic showing how pollutants are treated by bioretention without an underdrain (bioinfiltration) in the MIDS calculator. Pollutants captured by the BMP infiltrate into the underlying soil, thus resulting in complete removal of pollutants captured by the BMP.</font size>]] | [[File:Bioinfiltration pollutant treatment.jpg|thumb|300px|alt=schematic showing how pollutants are treated by bioinfiltration in MIDS calculator|<font size=3>Schematic showing how pollutants are treated by bioretention without an underdrain (bioinfiltration) in the MIDS calculator. Pollutants captured by the BMP infiltrate into the underlying soil, thus resulting in complete removal of pollutants captured by the BMP.</font size>]] | ||
− | Pollutant load reductions are calculated on an annual basis | + | Pollutant removal is accomplished via volume reduction processes in a bioinfiltration BMP. Pollutant load reductions are calculated on an annual basis and are thus dependent upon the volume of water retained by the BMP. |
− | + | The first step in calculating annual pollutant load reductions is to determine the annual ''Retention volume provided by BMP'' as discussed in the [[Requirements,_recommendations_and_information_for_using_bioretention_with_no_underdrain_BMPs_in_the_MIDS_calculator#Volume reduction capacity of BMP (V) and comparison with performance goal|Volume reduction section]]. All pollutants in this retained water are considered captured for a 100 percent removal since these pollutants are either attenuated within the media or pass into the underlying soil with infiltrating water. Thus, while oversizing a BMP above the ''Required treatment volume'' will not provide additional credit towards the performance goal volume, it may provide additional annual volume and pollutant load reduction. Pollutants in the stormwater that bypasses the BMP through overflow are not reduced. A schematic of the removal rates can be seen in the sidebar. | |
NOTE: The user can modify event mean concentrations (EMCs) on the ''Site Information'' tab in the calculator. Default concentrations are 54.5 milligrams per liter for total suspended solids (TSS) and 0.3 milligrams per liter for total phosphorus (particulate plus dissolved). The calculator will notify the user if the default is changed. Changing the default EMC will result in changes to the total pounds of pollutant reduced. | NOTE: The user can modify event mean concentrations (EMCs) on the ''Site Information'' tab in the calculator. Default concentrations are 54.5 milligrams per liter for total suspended solids (TSS) and 0.3 milligrams per liter for total phosphorus (particulate plus dissolved). The calculator will notify the user if the default is changed. Changing the default EMC will result in changes to the total pounds of pollutant reduced. | ||
==Routing== | ==Routing== | ||
− | A bioinfiltration basin can be routed to any other BMP, except for a [[Green roofs|green roof]] | + | A bioinfiltration basin can be routed to any other BMP, except for a [[Green roofs|green roof]], a [[Filtration|swale]] side slope, or any BMP that would cause stormwater to be rerouted back to the bioinfiltration basin already in the stormwater runoff treatment sequence. All BMPs can be routed to a bioinfiltration basin, except for a swale side slope BMP. |
==Assumptions== | ==Assumptions== | ||
The following general assumptions apply in calculating the credit for a bioretention basin. If these assumptions are not followed the volume and pollutant reduction credits cannot be applied. | The following general assumptions apply in calculating the credit for a bioretention basin. If these assumptions are not followed the volume and pollutant reduction credits cannot be applied. | ||
− | *The bioretention basin has been properly [[Design criteria for bioretention|designed]], [[Construction specifications for bioretention|constructed]] and will be properly [[Operation and maintenance of bioretention|maintained]]. | + | *The bioretention basin has been properly [[Design criteria for bioretention|designed]], [[Construction specifications for bioretention|constructed]], and will be properly [[Operation and maintenance of bioretention|maintained]]. |
*Stormwater runoff entering the bioretention basin has undergone [[Pre-treatment|pretreatment]]. | *Stormwater runoff entering the bioretention basin has undergone [[Pre-treatment|pretreatment]]. | ||
− | Stormwater captured by the BMP enters the BMP instantaneously and is initially ponded within the BMP. This will underestimate actual infiltration since some water will enter the soil/media during a rain event, thus creating more volume for storage in the BMP. | + | *Stormwater captured by the BMP enters the BMP instantaneously and is initially ponded within the BMP. This will underestimate actual infiltration since some water will enter the soil/media during a rain event, thus creating more volume for storage in the BMP. |
==Example application in the MIDS calculator (Version 2)== | ==Example application in the MIDS calculator (Version 2)== |
For a bioinfiltration (aka bioretention with no underdrain) BMP, all stormwater runoff captured by the BMP is infiltrated into the underlying soil between rain events. All pollutants in the captured water are credited as being reduced. Pollutants in the stormwater that bypasses the BMP are not reduced.
NOTE: A bioretention basin with no underdrain is a type of bioinfiltration device, since all of the water captured by the BMP that does not leave through overflow is infiltrated. MPCA feels that bioinfiltration is the more generally applicable term for this BMP type; but the reader will currently find both of these terms on relevant pages, due to MPCA's understanding that a variety of terms are currently common in stormwater management.
For bioinfiltration systems, the user must input the following parameters to calculate the volume and pollutant load reductions associated with the BMP.
If the following requirements for inputs into the MIDS calculator are not met, then an error message will inform the user to change the input to meet the requirement.
\(DDT_{calc} = D_O / (I_R / 12)\)
Where
Required treatment volume, or the volume of stormwater runoff delivered to the BMP, equals the performance goal (1.1 inches for MIDS or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously following the Kerplunk method.
For this BMP, the Volume reduction capacity of BMP (V) is equal to the amount of stormwater that can be instantaneously captured above the media and below the overflow point that will infiltrate into the underling soil/media within the required drawdown time. The Volume reduction capacity of BMP (V) is calculated with user-provided inputs, and is given by
\(V = ((A_O + A_M) / 2) * D_O\)
Where:
The MIDS calculator compares the Volume reduction capacity of BMP [V] with the Required treatment volume, and the lesser of the two values is used to populate the Volume of retention provided by BMP. This comparison between potential and actual treatment volumes ensures that the BMP does not claim more credit than is due based on the actual amount of water routed to it. The Volume of retention provided by BMP is the actual volume credit the BMP receives toward the instantaneous performance goal. For example, if the BMP is oversized the user will only receive volume credit for the Required treatment volume routed to the BMP.
Annual volume retention is assessed by converting the instantaneous Volume reduction capacity of BMP [V] to an annual volume reduction percentage. This is accomplished through the use of performance curves developed from a range of modeling scenarios. These performance curves use the Volume reduction capacity of BMP [V], the infiltration rate of the underlying soils, the percent imperviousness of the contributing watershed area, and the size of the contributing watershed to calculate the Percent annual runoff volume retained and annual Retention volume provided by BMP.
Pollutant removal is accomplished via volume reduction processes in a bioinfiltration BMP. Pollutant load reductions are calculated on an annual basis and are thus dependent upon the volume of water retained by the BMP.
The first step in calculating annual pollutant load reductions is to determine the annual Retention volume provided by BMP as discussed in the Volume reduction section. All pollutants in this retained water are considered captured for a 100 percent removal since these pollutants are either attenuated within the media or pass into the underlying soil with infiltrating water. Thus, while oversizing a BMP above the Required treatment volume will not provide additional credit towards the performance goal volume, it may provide additional annual volume and pollutant load reduction. Pollutants in the stormwater that bypasses the BMP through overflow are not reduced. A schematic of the removal rates can be seen in the sidebar.
NOTE: The user can modify event mean concentrations (EMCs) on the Site Information tab in the calculator. Default concentrations are 54.5 milligrams per liter for total suspended solids (TSS) and 0.3 milligrams per liter for total phosphorus (particulate plus dissolved). The calculator will notify the user if the default is changed. Changing the default EMC will result in changes to the total pounds of pollutant reduced.
A bioinfiltration basin can be routed to any other BMP, except for a green roof, a swale side slope, or any BMP that would cause stormwater to be rerouted back to the bioinfiltration basin already in the stormwater runoff treatment sequence. All BMPs can be routed to a bioinfiltration basin, except for a swale side slope BMP.
The following general assumptions apply in calculating the credit for a bioretention basin. If these assumptions are not followed the volume and pollutant reduction credits cannot be applied.
A bioretention basin without an underdrain is to be constructed in a watershed that contains a 1.4 acre parking lot surrounded by 0.8 acres of pervious area (turf area and the bioretention BMP). All of the runoff from the watershed will be treated by the bioretention basin. The soils across the entire area have a unified soils classification of SM (HSG type B soil). The bioretention basin is designed to have 1 foot of ponding depth below the overflow. The surface area of the bioretention basin at the overflow point will be 6534 square feet. If the outflow point is a pipe, the area is taken at the invert of the overflow pipe. The bottom surface area (the area at the media surface) is 5600 square feet. Following the MPCA Construction Stormwater General Permit requirement, ponded water in the bioretention basin needs to drawdown in a 48 hour time period. The following steps detail how this system would be set up in the MIDS calculator.
Step 1: Determine the watershed characteristics of your entire site. For this example we have a 2.2 acre site with 1.4 acres of impervious area and 0.8 acres of pervious area in type B soils. The pervious area includes the turf area and the area of the bioretention basin. The entire site drains into the bioretention basin.
Step 2: Fill in the site specific information into the Site Information tab. This includes entering a Zip Code (55414 for this example) and the watershed information from Step 1. The Managed turf area includes the turf area and the area of the bioretention basin. Zip code and impervious area must be filled in or an error message will be generated. Other fields on this screen are optional.
Step 3: Go to the Schematic tab and drag and drop the Bioretention basin (w/o underdrain) icon into the Schematic Window
Step 4: Open the BMP properties for the bioretention basin by right clicking on the Bioretention basin (w/o underdrain) icon and selecting Edit BMP properties, or by double clicking on the Bioretention basin (w/o underdrain) icon.
Step 5: If help is needed, click on the Minnesota Stormwater Manual Wiki link or the Help button to review input parameter specifications and calculation specific to the Bioretention basin (w/o underdrain) BMP.
Step 6: Determine the watershed characteristics for the Bioretention basin. For this example the entire site is draining to the bioretention basin. The watershed parameters therefore include a 2.2 acre site with 1.4 acres of impervious area and 0.8 acres of pervious turf area in type B soils. There is no routing for this BMP. Fill in the BMP specific watershed information (1.4 acres on impervious cover and 0.8 acres of Managed turf in B soils).
Step 7: Click on the BMP Parameters tab and enter the BMP design parameters. Bioretention basin with no underdrain requires the following entries.
Step 8: Click on BMP Summary tab to view results for this BMP.
Step 9: Click on the OK button to exit the BMP properties screen.
Step 10: Click on Results tab to see overall results for the site.