m |
m |
||
Line 17: | Line 17: | ||
<td>1</td> | <td>1</td> | ||
<td>See section on [http://stormwater.pca.state.mn.us/index.php/Potential_stormwater_hotspots Potential stormwater hotspots] for more information</td> | <td>See section on [http://stormwater.pca.state.mn.us/index.php/Potential_stormwater_hotspots Potential stormwater hotspots] for more information</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Constructed ponds or constructed wetlands with less than 3 feet separation from seasonally high water table in a potential hotspot</td> | ||
+ | <td>1</td> | ||
+ | <td></td> | ||
</tr> | </tr> | ||
<tr> | <tr> |
Design process for selecting the appropriate liner level.
Link to this table
Condition | Design level | Note |
---|---|---|
Filtration BMP with less than 3 feet of separation to seasonal saturated soil or bedrock | 1 | Required under the Construction Stormwater permit |
BMP in confirmed PSH with high or very high groundwater pollution potential | 1 | See section on Potential stormwater hotspots for more information |
Constructed ponds or constructed wetlands with less than 3 feet separation from seasonally high water table in a potential hotspot | 1 | |
Karst terrain with high or very high groundwater pollution potential | 1 | See section on karst for more information |
Maintain permanent pool in areas underlain by geologic material that is fractured or has a high infiltration rate | 2 | |
Separation distances cannot be achieved | 2 | |
Separate tree BMP from road, parking lot, sidewalk or adjacent walls or building foundation | 2 | To prevent tree root intrusion. See link |