Line 80: Line 80:
 
<td>  </td>
 
<td>  </td>
 
<td>&#128178;167</td>
 
<td>&#128178;167</td>
 +
</tr>
 +
 +
 +
 +
<tr>
 +
<td>I-5 / La Costa (east)</td>
 +
<td>Wet Pond</td>
 +
<td>  </td>
 +
<td>9,150</td>
 +
<td>cf</td>
 +
<td>4.2</td>
 +
<td>ac </td>
 +
<td>  </td>
 +
<td>  </td>
 +
<td>&#128178;769,841</td>
 +
<td> </td>
 +
<td> </td>
 +
<td>  </td>
 +
<td>2000</td>
 +
<td>CA</td>
 +
<td>1</td>
 +
<td>1.27</td>
 +
<td>&#128178;974,619</td>
 +
<td>1.24</td>
 +
<td>&#128178;880,301</td>
 +
<td>  </td>
 +
<td>&#128178;96</td>
 
</tr>
 
</tr>
  

Revision as of 17:21, 21 December 2017

Wet Ponds data table
Link to this table
BMP Site Name BMP Type Ownership Treated Volume Units Total Watershed Area Units Watershed Land Use Expected Life Span Construction Costs Land Costs or Value Adjusted Maint Costs Average Annual Maintenance Costs Year of Cost Estimate State Data Source CPI factor Cost in 2010 dollars Rain Zone Factor Zone 1 - 2010 dollars Cost per treatment volume (cf)
Lakewood RP SF Vault (95) Wet Pond 700 cf 1.6 ac 💲57,000 1995 CO 1 1.43 💲81,568 0.76 💲120,205 💲172
Lakewood RP - MF Vault (96) Wet Pond 700 cf 1.6 ac 💲57,000 1996 CO 1 1.43 💲79,174 0.76 💲16,677 💲167
I-5 / La Costa (east) Wet Pond 9,150 cf 4.2 ac 💲769,841 2000 CA 1 1.27 💲974,619 1.24 💲880,301 💲96
  • Ave maint 💲1.25
  • SD maint 💲1.18
  • Average 💲15
  • Standard Deviation 💲9