m (photo) |
(photo) |
||
Line 1: | Line 1: | ||
This page provides information to help facilities determine if they need industrial stormwater permit coverage. Any facility that is engaged in a Narrative Activity or a Primary SIC Code, as listed within [http://stormwater.pca.state.mn.us/index.php/APPENDIX_D._SECTORS_OF_INDUSTRIAL_ACTIVITIES_AUTHORIZED Appendix D] of the Multi-Sector General Permit, or within the table below, needs to apply for permit coverage or certify for No Exposure. | This page provides information to help facilities determine if they need industrial stormwater permit coverage. Any facility that is engaged in a Narrative Activity or a Primary SIC Code, as listed within [http://stormwater.pca.state.mn.us/index.php/APPENDIX_D._SECTORS_OF_INDUSTRIAL_ACTIVITIES_AUTHORIZED Appendix D] of the Multi-Sector General Permit, or within the table below, needs to apply for permit coverage or certify for No Exposure. | ||
− | [[File:Airport.jpg|500 px|thumb| | + | [[File:Airport.jpg|500 px|thumb|left|alt=aerial photo of municipal airport|municipal airport with fueling activities requiring permit coverage]] |
'''Have a specific question or situation regarding applicability? Check out these resources first:''' | '''Have a specific question or situation regarding applicability? Check out these resources first:''' |
This page provides information to help facilities determine if they need industrial stormwater permit coverage. Any facility that is engaged in a Narrative Activity or a Primary SIC Code, as listed within Appendix D of the Multi-Sector General Permit, or within the table below, needs to apply for permit coverage or certify for No Exposure.
Have a specific question or situation regarding applicability? Check out these resources first:
What's a Narrative Activity? These activities require permit coverage even if it's not the "primary" activity at a facility. Facilities with these activities are always required to obtain permit coverage:
Subsector | Subsector description |
---|---|
A4 | Timber products: discharges from wet decking storage areas |
C1 | Runoff from phosphate fertilizer manufacturing facilities that comes into contact with any raw materials, finished product, by-products, or waste products |
D2 | Discharges from production of asphalt emulsions areas |
E3 | Cement manufacturing facility, material storage runoff (note: this is not a concrete ready mix facility) |
K1 | Hazardous waste treatment/storage/disposal facility for discharges not subject to effluent limitations in 40 CFR pt. 445, subp. A (note: this is not a hazardous waste generator) |
K2 | Hazardous waste treatment/storage/disposal facility for discharges subject to effluent limitations in 40 CFR pt. 445, subp. A (note: this is not a hazardous waste generator) |
L1 | Municipal solid waste landfill areas closed in accordance with 40 CFR 258.60 |
L2 | Open or closed non-hazardous waste landfill and land application site not discharging to surface water |
L3 | Landfill that discharges to surface waters stormwater that has directly contacted solid waste |
O1 | Coal fired and oil fired steam electric generating facility |
O2 | Nuclear, natural gas fired, and any other fuel source used for steam electric generation |
O3 | Runoff from coal storage piles at steam electric generating facility |
S3 | Existing and new primary airports with 1,000 or more annual jet departures that discharge wastewater associated with airfield pavement deicing that contains urea commingled with stormwater |
T1 | Treatment works with design flow of one million gallons per day or more or are required to have an approved pretreatment program under 40 CFR pt. 403 |
How do I look up a SIC code? What if I have a NAICS code?
Guidance materials and resources: