Line 5: Line 5:
 
Narrative description of pretreatment project
 
Narrative description of pretreatment project
 
:'''Project Location''':
 
:'''Project Location''':
 
 
:'''Year Constructed''':
 
:'''Year Constructed''':
 
 
:'''Type of Pretreatment Practice''': (e.g., forebay, proprietary settling device, etc.)
 
:'''Type of Pretreatment Practice''': (e.g., forebay, proprietary settling device, etc.)
 
 
:'''Specific Practice''': (e.g., rock inlet, name of proprietary device)
 
:'''Specific Practice''': (e.g., rock inlet, name of proprietary device)
 
 
:'''Practice Owner''':
 
:'''Practice Owner''':
 
 
:'''Practice Designer''':
 
:'''Practice Designer''':
 
===Design Considerations===
 
===Design Considerations===
 
:'''Design Cost''':
 
:'''Design Cost''':
 
 
:'''Design Year''':
 
:'''Design Year''':
 
Narrative description of contributing drainage area, including description of land use
 
Narrative description of contributing drainage area, including description of land use
Line 23: Line 17:
 
List of existing impairments and TMDLs that the BMP drains to
 
List of existing impairments and TMDLs that the BMP drains to
 
:'''Total Contributing Drainage Area''' (acres):
 
:'''Total Contributing Drainage Area''' (acres):
 
 
:'''Total Impervious Area''' (acres):
 
:'''Total Impervious Area''' (acres):
 
 
:'''Watershed Slope''' (%):
 
:'''Watershed Slope''' (%):
 
 
:'''Downstream Structural Best Management Practice''':
 
:'''Downstream Structural Best Management Practice''':
 
 
:'''Design Pollutant Removal Performance''':
 
:'''Design Pollutant Removal Performance''':
 
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
 
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Line 36: Line 26:
 
===Construction Considerations===
 
===Construction Considerations===
 
:'''Construction Cost''':
 
:'''Construction Cost''':
 
 
:'''Construction Year''':
 
:'''Construction Year''':
 
Description of adverse site conditions/other construction challenges encountered during installation
 
Description of adverse site conditions/other construction challenges encountered during installation
Line 42: Line 31:
 
List or description of types of maintenance practices used for the upkeep of the pretreatment system
 
List or description of types of maintenance practices used for the upkeep of the pretreatment system
 
:'''Maintenance Frequency''':
 
:'''Maintenance Frequency''':
 
 
:'''Maintenance Cost''':
 
:'''Maintenance Cost''':
 
 
:'''Disposal Cost''':
 
:'''Disposal Cost''':
 
Description of maintenance challenges, discussion of ease of maintenance
 
Description of maintenance challenges, discussion of ease of maintenance

Revision as of 19:13, 25 January 2019

This site is currently undergoing revision. For more information, open this link.
This page is in development

Project Name

Project Overview

Narrative description of pretreatment project

Project Location:
Year Constructed:
Type of Pretreatment Practice: (e.g., forebay, proprietary settling device, etc.)
Specific Practice: (e.g., rock inlet, name of proprietary device)
Practice Owner:
Practice Designer:

Design Considerations

Design Cost:
Design Year:

Narrative description of contributing drainage area, including description of land use

List of existing impairments and TMDLs that the BMP drains to

Total Contributing Drainage Area (acres):
Total Impervious Area (acres):
Watershed Slope (%):
Downstream Structural Best Management Practice:
Design Pollutant Removal Performance:

Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)

Description of sizing criteria used to design pretreatment practice

Construction Considerations

Construction Cost:
Construction Year:

Description of adverse site conditions/other construction challenges encountered during installation

Maintenance Considerations

List or description of types of maintenance practices used for the upkeep of the pretreatment system

Maintenance Frequency:
Maintenance Cost:
Disposal Cost:

Description of maintenance challenges, discussion of ease of maintenance

Discussion of any additional maintenance considerations

Results

Measured or Estimated Pollutant Removal Performance:

Discussion of how the performance was measured or estimated

For proprietary practices, did were the manufacturer claims met?

Discussion of lessons learned through the implementation of this pretreatment practice