(Created page with "<font size=3>'''General WinSLAMM result QAQC list'''</font size><br> Link to this table <table class="sortable"> <tr> <th>QA/QC review i...") |
|||
Line 41: | Line 41: | ||
<tr> | <tr> | ||
<td>Compare TSS/TP removal rate to typical values in <font color="red">Table 10</font></td> | <td>Compare TSS/TP removal rate to typical values in <font color="red">Table 10</font></td> | ||
− | <td>Calculate pollutant removal (%) as described in Table 41. Note: must have junction elements upstream and downstream of all control practices</td> | + | <td>Calculate pollutant removal (%) as described in <font color="red">Table 41</font>. Note: must have junction elements upstream and downstream of all control practices</td> |
</tr> | </tr> | ||
</table> | </table> |
General WinSLAMM result QAQC list
Link to this table
QA/QC review item | Related WinSLAMM output |
---|---|
Confirm total watershed area is correct | Output Summary → Total Area Modeled (ac) |
Confirm area modeled in each land uses is correct | Review land use summary table shown in the main model space window |
Confirm source areas or applied SLUs are correct for each land use | Review source area modeling assumptions for each land use |
Confirm correct number of control devices modeled in drainage network and source areas | Review control practice summary table shown in the main model space window |
Confirm correct parameters modeled in control practices | Review parameters applied in control practice parameter window for all modeled drainage area and source area control practices |
Confirm land use, junction, and device routing | Review routing in main model space window |
Confirm precipitation event totals are correct | Review precipitation dates and rainfall depth totals. Can be accessed through a number of output tabs including "Junction → Runoff Volume" |
Compare source area outflow pollutant concentration to values in Table 9 | Output: Land Uses → Pollutants → Concentration (mg/L) |
Compare TSS/TP removal rate to typical values in Table 10 | Calculate pollutant removal (%) as described in Table 41. Note: must have junction elements upstream and downstream of all control practices |