m |
m |
||
Line 13: | Line 13: | ||
==Calculating soil loss - Universal Soil Loss Equation== | ==Calculating soil loss - Universal Soil Loss Equation== | ||
− | [[File:Erodibility table 2.png| | + | [[File:Erodibility table 2.png|300px|thumb|alt=table with soil erodibility|<font size=3>Soil erodibility index</font size>]] |
The Universal Soil Loss Equation (USLE) and it's update, the Revised Universal Soil Loss Equation (RUSLE) are used to predict sheet and rill erosion. These equations do not apply to gully erosion and dispersive soils. The annual soil loss, in tons per acre, is given by the following formula. | The Universal Soil Loss Equation (USLE) and it's update, the Revised Universal Soil Loss Equation (RUSLE) are used to predict sheet and rill erosion. These equations do not apply to gully erosion and dispersive soils. The annual soil loss, in tons per acre, is given by the following formula. |
Erodibility describes or is a measure of the inherent resistance of geologic materials (soils and rocks) to erosion. Highly erodible geologic materials are readily displaced and transported by water. This page provides basic information about soil erodibility.
There are four types of soil erosion.
The Universal Soil Loss Equation (USLE) and it's update, the Revised Universal Soil Loss Equation (RUSLE) are used to predict sheet and rill erosion. These equations do not apply to gully erosion and dispersive soils. The annual soil loss, in tons per acre, is given by the following formula.
Annual soil loss = R * K * LS * C * P
where
RUSLE factors are observable in the field and fairly simple to derive. The R and K variables are generally out of the hands of the construction site operator. Slope (S) and slope length (L) can sometimes be managed or impacted during the design phase of project development. Two RUSLE variables which can be controlled at active construction sites – the cover and practices factors (i.e., variables C and P) – are the focus of the erosion prevention measures. Erosion prevention practices, which mostly include soil preparation, vegetation, and the application of a mulch, blanket, mat, or other cover on bare soil, are the easiest, cheapest, and most effective approach for addressing runoff from construction sites. Sediment control – settling soil particles from temporarily ponded runoff water or filtering it using silt fencing or other materials – is more difficult, more expensive, and requires much more maintenance.
For more information on the USLE and RUSLE, see the following.