Line 5: | Line 5: | ||
===5.2=== | ===5.2=== | ||
<big>The applicant must submit a complete application in accordance with Sections 9 through 12 in order to obtain authorization | <big>The applicant must submit a complete application in accordance with Sections 9 through 12 in order to obtain authorization | ||
− | to discharge stormwater from a small [https://stormwater.pca.state.mn.us/index.php?title=What_is_a_municipal_separate_storm_sewer_system_(MS4)%3F MS4] under the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf General Permit]. [[https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001]]</big> | + | to discharge <span title="Stormwater runoff, snow melt runoff, and surface runoff and drainage.">'''stormwater'''</span> from a small [https://stormwater.pca.state.mn.us/index.php?title=What_is_a_municipal_separate_storm_sewer_system_(MS4)%3F MS4] under the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf General Permit]. [[https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001]]</big> |
===5.3=== | ===5.3=== | ||
<big>The <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">'''Commissioner'''</span> reviews the General Permit application for completeness. After review, the Commissioner will do one of | <big>The <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">'''Commissioner'''</span> reviews the General Permit application for completeness. After review, the Commissioner will do one of |
Permit Authorization. [Minn. R. 7001]
The applicant must submit a complete application in accordance with Sections 9 through 12 in order to obtain authorization to discharge stormwater from a small MS4 under the General Permit. [Minn. R. 7001]
The Commissioner reviews the General Permit application for completeness. After review, the Commissioner will do one of the following:
The Commissioner provides a public notice with the opportunity for a hearing on the preliminary determination to issue coverage under the General Permit. [Minn. R. 7001]
Upon receipt of written notification of final approval of the application from the Commissioner, the applicant is authorized to discharge stormwater from the small MS4 under the terms and conditions of the General Permit. [Minn. R. 7001]