Line 16: | Line 16: | ||
===5.4=== | ===5.4=== | ||
<big>The <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">'''Commissioner'''</span> provides a public notice with the opportunity for a hearing on the preliminary determination to issue | <big>The <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">'''Commissioner'''</span> provides a public notice with the opportunity for a hearing on the preliminary determination to issue | ||
− | coverage under the General Permit. [[https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001]]</big> | + | coverage under the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf General Permit]. [[https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001]]</big> |
===5.5=== | ===5.5=== | ||
− | <big>Upon receipt of written notification of final approval of the application from the <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">'''Commissioner'''</span>, the applicant is authorized to discharge stormwater from the small [https://stormwater.pca.state.mn.us/index.php?title=What_is_a_municipal_separate_storm_sewer_system_(MS4)%3F MS4] under the terms and conditions of the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf General Permit]. [[https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001]]</big> | + | <big>Upon receipt of written notification of final approval of the application from the <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">'''Commissioner'''</span>, the applicant is authorized to discharge <span title="Stormwater runoff, snow melt runoff, and surface runoff and drainage.">'''stormwater'''</span> from the small [https://stormwater.pca.state.mn.us/index.php?title=What_is_a_municipal_separate_storm_sewer_system_(MS4)%3F MS4] under the terms and conditions of the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf General Permit]. [[https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001]]</big> |
Permit Authorization. [Minn. R. 7001]
The applicant must submit a complete application in accordance with Sections 9 through 12 in order to obtain authorization to discharge stormwater from a small MS4 under the General Permit. [Minn. R. 7001]
The Commissioner reviews the General Permit application for completeness. After review, the Commissioner will do one of the following:
The Commissioner provides a public notice with the opportunity for a hearing on the preliminary determination to issue coverage under the General Permit. [Minn. R. 7001]
Upon receipt of written notification of final approval of the application from the Commissioner, the applicant is authorized to discharge stormwater from the small MS4 under the terms and conditions of the General Permit. [Minn. R. 7001]