Line 48: | Line 48: | ||
##Checking the BMP and associated piping/conveyances for clogging | ##Checking the BMP and associated piping/conveyances for clogging | ||
##Assessing performance, such as observing drawdown times and observing evidence of flooding | ##Assessing performance, such as observing drawdown times and observing evidence of flooding | ||
− | #What is the maximum recommended slope on a green roof (without reinforcement)? | + | #What is the maximum recommended slope on a <span title="Green roofs consist of a series of layers that create an environment suitable for plant growth without damaging the underlying roof system. Green roofs create green space for public benefit, energy efficiency, and stormwater retention/ detention."> '''[https://stormwater.pca.state.mn.us/index.php?title=Green_roofs green roof]'''</span> (without reinforcement)? |
##1:2 | ##1:2 | ||
##2:10 | ##2:10 |
Answers below
Answers
Answers