Line 16: | Line 16: | ||
*A ''Stormwater disconnection (Impervious disconnection)'' BMP was created. Stormwater disconnection/Impervious surface disconnection spreads runoff generated from parking lots, driveways, rooftops, sidewalks and other impervious surfaces onto adjacent pervious areas where it can be infiltrated. All pollutants in the infiltrated water are credited as being reduced. Pollutants in the stormwater that bypasses the best management practice (BMP) receive 68 percent removal for total suspended solids (TSS) and 0 percent reduction for both dissolved and particulate phosphorus. Guidance, methodology, and an example are provided on [https://stormwater.pca.state.mn.us/index.php?title=Requirements,_recommendations_and_information_for_using_stormwater_disconnection_%28impervious_disconnection%29_BMPs_in_the_MIDS_calculator this page]. A summary of the calculation methodology is found at [http://stormwater.pca.state.mn.us/index.php/Turf this link]. This BMP cannot be used for compliance with the [https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_program Construction Stormwater permit]. | *A ''Stormwater disconnection (Impervious disconnection)'' BMP was created. Stormwater disconnection/Impervious surface disconnection spreads runoff generated from parking lots, driveways, rooftops, sidewalks and other impervious surfaces onto adjacent pervious areas where it can be infiltrated. All pollutants in the infiltrated water are credited as being reduced. Pollutants in the stormwater that bypasses the best management practice (BMP) receive 68 percent removal for total suspended solids (TSS) and 0 percent reduction for both dissolved and particulate phosphorus. Guidance, methodology, and an example are provided on [https://stormwater.pca.state.mn.us/index.php?title=Requirements,_recommendations_and_information_for_using_stormwater_disconnection_%28impervious_disconnection%29_BMPs_in_the_MIDS_calculator this page]. A summary of the calculation methodology is found at [http://stormwater.pca.state.mn.us/index.php/Turf this link]. This BMP cannot be used for compliance with the [https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_program Construction Stormwater permit]. | ||
*The ''Harvest and re-use/Cistern'' BMP was modified as follows. | *The ''Harvest and re-use/Cistern'' BMP was modified as follows. | ||
− | **The calculation for water use utilizes a method for determining variable irrigation demand based on potential evapotranspiration (PET) from the irrigated area, adjusted for vegetation type. Regional values for PET were developed by using data collected from the | + | **The calculation for water use utilizes a method for determining variable irrigation demand based on potential evapotranspiration (PET) from the irrigated area, adjusted for vegetation type. Regional values for PET were developed by using data collected from the University of Wisconsin Extension. Zip codes were associated with the appropriate PET. The calculator adjusts the PET for vegetation type by asking for a plant factor (e.g. turf, vegetables, etc.) and using a corresponding crop coefficient. |
**The user can enter a weekly irrigation rate as in Version 2, but if the user does not select a weekly rate, the irrigation amount will be calculated using irrigation demand based on PET. If the user selects a weekly rate, the daily maximum applied amount will be the smaller of the irrigation demand or weekly rate (calculated as a daily average). In making these calculations, it is ensured that water can only be applied if available in storage and that daily irrigation considers precipitation that has fallen on that day. For A soils, user-input rates of up to 2 inches per week are allowed. For D soils, a warning is flashed reminding the user that irrigation rates or timing must be considered on these slowly infiltrating soils. | **The user can enter a weekly irrigation rate as in Version 2, but if the user does not select a weekly rate, the irrigation amount will be calculated using irrigation demand based on PET. If the user selects a weekly rate, the daily maximum applied amount will be the smaller of the irrigation demand or weekly rate (calculated as a daily average). In making these calculations, it is ensured that water can only be applied if available in storage and that daily irrigation considers precipitation that has fallen on that day. For A soils, user-input rates of up to 2 inches per week are allowed. For D soils, a warning is flashed reminding the user that irrigation rates or timing must be considered on these slowly infiltrating soils. | ||
**Users can input a weekly volume retained on-site for non-irrigation uses. | **Users can input a weekly volume retained on-site for non-irrigation uses. |
NOTE: The MIDS Calculator has been updated to version 4. This page describes changes from Version 2 to Version 3. Version 3.0 includes the following changes from Version 2.