+ | Below is a summary of requirements, recommendations and other information for using the Minimal Impacts Design Standards (MIDS) calculator for bioretention BMPs. | ||
+ | |||
*Required | *Required | ||
**3 foot separation from the bottom of the bioretention system to seasonal high water table | **3 foot separation from the bottom of the bioretention system to seasonal high water table | ||
Line 10: | Line 12: | ||
**Field tested infiltration rates over table values | **Field tested infiltration rates over table values | ||
*Information – provide links to the following*Guidance on determining infiltration rates | *Information – provide links to the following*Guidance on determining infiltration rates | ||
− | **Information site constraints (shallow soil, karst, etc.) | + | **Information on [[ |
+ | Stormwater infiltration and constraints on infiltration|site constraints]] (shallow soil, karst, etc.) | ||
**Information on assessing BMPs | **Information on assessing BMPs | ||
**Information on design metrics (high flow bypass, ponding depths, drawn down) | **Information on design metrics (high flow bypass, ponding depths, drawn down) |