m
m
Line 1: Line 1:
Below is a summary of requirements, recommendations and other information for using the Minimal Impacts Design Standards (MIDS) calculator for bioretention BMPs. Links to MIDS pages are included at the bottom of this page.
+
Below is a summary of requirements, recommendations and other information for using the Minimal Impacts Design Standards (MIDS) calculator for bioretention BMPs. Links to MIDS pages are included at the bottom of this page.
  
 
{{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}}
 
{{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}}
Line 27: Line 27:
 
*Information on [[Operation and maintenance of bioretention|operation and maintenance of bioretention BMPs]].
 
*Information on [[Operation and maintenance of bioretention|operation and maintenance of bioretention BMPs]].
  
+
 
 
Links to MIDS pages
 
Links to MIDS pages
[[Performance goals for new development, re-development and linear projects]]
+
*[[Performance goals for new development, re-development and linear projects]]
[[Flexible treatment options]]
+
*[[Flexible treatment options]]
[[Ordinance goals]]
+
*[[Ordinance goals]]
[[MIDS calculator]]
+
*[[MIDS calculator]]

Revision as of 20:28, 16 May 2013

Below is a summary of requirements, recommendations and other information for using the Minimal Impacts Design Standards (MIDS) calculator for bioretention BMPs. Links to MIDS pages are included at the bottom of this page.

Warning: The following are requirements of the Minnesota Construction Stormwater General Permit
  • 3 foot separation from the bottom of the bioretention system to seasonal high water table
  • Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
  • Drawdown time of 24 hours for trout streams
  • For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement)
  • Pretreatment


Caution: The following are recommendations for inputs into the MIDS calculator
  • 5 acre or less for contributing area
  • Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin)
  • Field tested infiltration rates over table values


Information: The following information may be useful in determining inputs for the MIDS calculator
  • Guidance on determining infiltration rates
  • Information on site constraints (shallow soil, karst, etc.)
  • Information on assessing BMPs
  • Information on design metrics (high flow bypass, ponding depths, drawn down)
  • Guidance on pretreatment
  • Information on soil mixes
  • Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance
  • Construction specifications
  • Information on operation and maintenance of bioretention BMPs.


Links to MIDS pages