Construction Sequence |
Satisfactory/ Unsatisfacroty |
Comments |
1. Pre Construction |
Pre Construction Meeting |
|
|
Runoff diverted |
|
|
Facility area cleared |
|
|
Soil tested for permibility |
|
|
Project benchmark near site |
|
|
facility location staked out |
|
|
Temporary erosion and sedimant protection properly installed |
|
|
2. Excavation |
lateral slopes completly level |
|
|
Soils not compacted durring excavation |
|
|
Longitudinal slopes within design range |
|
|
Stockpile location not adjacent to excavation area and stablized with vegitation and/or silt fence |
|
|
3. Structural Components |
Stone diaphragm installed per plans |
|
|
Outlets installed pre plans |
|
|
Underdrain installed to grade |
|
|
Pretreatment devices installed per plans |
|
|
Soil bed composition and texture conforms to
specifications |
|
|
4. Vegitation |
Construction Sequence |
|
|
Complies with planting specs |
|
|
Topsoil complies with specs in composition and
placement |
|
|
Soil properly stabilized for permanent erosion
control |
|
|
5. Final Inspection |
Dimensions per plans |
|
|
Pretreatment operational |
|
|
Inlet/outlet operational |
|
|
Soil/ filter bed permeability verified |
|
|
Effective stand of vegetation stabilized |
|
|
Construction generated sediments removed |
|
|
Contributing watershed stabilized before flow is
diverted to the practice |
|
|