Wet swale operation and maintenance checklist.
Link to this table
To access an Excel version of form (for field use), click here.

Project:
Location:
Site Status:
Date:
Time:
Inspector:
Maintenance Item Satisfactory / Unsatisfactory Comments
1. Debris Cleanout (Monthly)
Project:
Contributing areas clean of litter and vegetative debris
Filtration or infiltration facility clean
Inlets and outlets clear
2. Vegetation (Monthly)
Vegetation maintenance complies with O&M plan
Vegetation meets performance standards (including control of specified invasive species)
No evidence of erosion
Maintenance of adequate water depths for desired wetland plant species
Have sediment accumulations reduced wet swale volume significantly or are plants “choked” with sediment
3. Inundated Portion of Swale (Monthly)
Floating or floatable debris removal required
Visible pollution
Eutrophication level of the wet swale
No evidence of erosion
4. Sediment Deposition (Annual)
Area clean of sediment
Contributing drainage area stabilized and free of erosion
Winter accumulation of sand removed each spring
5. Outlet/Overflow Spillway (Annual, After Major Storms)
Good condition, no need for repair
No evidence of erosion
No evidence of any blockages
No evidence of structural deterioration
6. Other (Monthly)
Encroachment on easement area (if applicable)
Complaints from residents (if applicable)
Any public hazards (specify)
Comments:
Actions to be taken: