This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
Preliminary information
Conduct site review
- Aerial photos and topographic maps
- County soil surveys and other soil information as available
- County Geologic Atlas
- Local groundwater levels
- DWSMA and Wellhead Protection maps
- FEMA and local floodplain maps
- Soil borings and site survey
- MPCA listing of potentially contaminated sites
- Phase 1 and 2 Environmental Site Assessments
- TMDLs and local water quality standards
- Wetland delineations, MNRAM assessments, and wetland classifications
- Proposed conditions, conceptural/preliminary site design
- Local zoning and land use requirements/ordinances, including stormwater rate control requirements
- Communication with local landowners, LGU, or others knowledgeable about the site
- Site inspection
Define treatment goal
- New and redevelopment projects: Retain on site a volume of 1.1 inches from impervious surfaces
- Linear projects: Retain on site the larger of 1.1 inches from all new impervious surfaces or 0.55 inches from all new and fully reconstructed impervious surfaces
Begin Flow chart
Flow chart
Does the project create one acre or more of new and/or fully reconstructed impervious surfaces?
Goal does not apply
The MIDS performance goal does not apply
DWSMA
Is the site located in a DWSMA, wellhead protection area, or near a drinking well?
DWSMA1
- Select Flexible Treatment Option
- (FTO) Alternative No. 2
- Revise Treatment Goal
- No infiltration practices allowed
- Provide DWSMA or well location map
next
Utilities, structures, land use requirements
Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive?
Utilities1
Is BMP relocation possible?
Utilities2
Are Flexible Treatment Option Alternatives number 1 or number 2 feasible?
Utilities3
Investigate Off-Site Considerations:
- Banking within watershed with goal of:
- Linear: 0.55 inches over impervious
- Nonlinear: 1.1 inches over impervious
- Cash as determined by LGU
Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal or FTO Alternatives
END
Utilities4
- Select Flexible Treatment Option Alternative No. 1 or No. 2
- Revise Treatment Goal
- Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal
next
Karst, shallow groundwater, shallow bedrock