This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.


DO NOT SCROLL AROUND ON THIS PAGE.


READ THE ALERT BOX BELOW.


Information: INFORMATION ON USING THE FLOW CHART SEQUENCE:
  • when you click on an answer (Yes or No), the next question in the sequence will be at the top of the page.
  • if a decision point is reached (a performance goal or FTO is determined), there will be a blue alert box and a message saying you have completed the flow chart sequence.
  • solid lines separate different questions in the sequence. Remember the next question in your sequence is at the top of the page.
  • Read the Preliminary information before before launching the Flow Chart.
  • You can launch the Flow Chart once the Preliminary information section is complete.

Preliminary information

Prior to using the flow chart, gather the following preliminary information.

  • Conduct site review
  • Define performance goal

Conduct site review

  • Aerial photos and topographic maps
  • County soil surveys and other soil information as available
  • County Geologic Atlas
  • Local groundwater levels
  • DWSMA and Wellhead Protection maps
  • FEMA and local floodplain maps
  • Soil borings and site survey
  • MPCA listing of potentially contaminated sites
  • Phase 1 and 2 Environmental Site Assessments
  • TMDLs and local water quality standards
  • Wetland delineations, MNRAM assessments, and wetland classifications
  • Proposed conditions, conceptural/preliminary site design
  • Local zoning and land use requirements/ordinances, including stormwater rate control requirements
  • Communication with local landowners, LGU, or others knowledgeable about the site
  • Site inspection

Define treatment goal

  • New and redevelopment projects: Retain on site a volume of 1.1 inches from impervious surfaces
  • Linear projects: Retain on site the larger of 1.1 inches from all new impervious surfaces or 0.55 inches from all new and fully reconstructed impervious surfaces



Launch Flow chart


__________________________________________________
__________________________________________________

Does the project create one acre or more of new and/or fully reconstructed impervious surfaces?

_________________________________________________________

MIDS performance goal does not apply

Information: The MIDS performance goal does not apply

YOU HAVE COMPLETED THE FLOW CHART
_____________________________________________________

Is the project linear?


_________________________________________________________

Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?

_________________________________________________________

Can a reasonable effort to acquire all of the ROW be accomplished?

_________________________________________________________

Is FTO Alternative Number 2 feasible?

_________________________________________________________

Select FTO Alternative 2 (linear projects)

Information: Select FTO Alternative 2. Provide documentation of off-site run-on to project area. Provide documentation of lack of ROW

Link to FTO #2

YOU HAVE COMPLETED THE FLOW CHART
_________________________________________________________

Select FTO Alternative 3 (linear projects, zoning/land use requirements)

Information: Provide soil survey, maps, regulations, and/or cost estimates documenting that meeting the original performance goal or FTO alternatives is not feasible in addition to other documentation as required by LGU

Link to FTO#3

YOU HAVE COMPLETED THE FLOW CHART
_________________________________________________________

Are there zoning and land use requirements that make the Performance Goal not feasible?


Is the site located in a DWSMA, wellhead protection area, or within 200 feet of a drinking water well?

DWSMA1

  • Select Flexible Treatment Option
  • (FTO) Alternative No. 2
  • Revise Treatment Goal
  • No infiltration practices allowed
  • Provide DWSMA or well location map

next

Utilities, structures, land use requirements

Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive?

Utilities1

Is BMP relocation possible?

Utilities2

Are Flexible Treatment Option Alternatives number 1 or number 2 feasible?

Utilities3

Investigate Off-Site Considerations:

  1. Banking within watershed with goal of:
  • Linear: 0.55 inches over impervious
  • Nonlinear: 1.1 inches over impervious
  1. Cash as determined by LGU

Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal or FTO Alternatives

END

Utilities4

  • Select Flexible Treatment Option Alternative No. 1 or No. 2
  • Revise Treatment Goal
  • Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal

next

Karst, shallow groundwater, shallow bedrock

Flexible Treatment Option 1 (FTO #1)

Applicant attempts to comply with the following conditions:

  1. Achieve at least 0.55 inch volume reduction goal, and
  2. Remove 75 percent of the annual total phosphorus load, and
  3. Options considered and presented shall examine the merits of reloacting project elements to address varying soil conditions and other constraints across the site

Flexible Treatment Option 2 (FTO #2)

Applicant attempts to comply with the following conditions:

  1. Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and
  2. Remove 60 percent of the annual total phosphorus load, and
  3. options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site.

Flexible Treatment Option 3 (FTO#3)

Off-site mitigation (including banking or cash or treatment on another project, as determined by the local authority) equivalent to the volume reduction performance goal can be used in areas selected in the following order of preference:

  1. Locations that yield benefits to the same receiving water that receives runoff from the original construction activity.
  2. Locations within the same Department of Natural Resources (DNR) catachment area as the original construction activity.
  3. Locations in the next adjacent DNR catchment area up-stream.
  4. Locations anywhere within the local authoritie's jurisdiction.