Warning: This site has not been fully peer reviewed. If you are interested in reviewing it, please send comments using the Feedback at the bottom of the page
This schematic illustrates typical pervious concrete cross section and basic components of a pervious concrete system
Schematic illustrating typical pervious concrete cross section and basic components of a pervious concrete system.
This schematic illustrates typical porous asphalt cross section and basic components of a pervious concrete system
Schematic illustrating typical porous asphalt cross section and basic components of a pervious concrete system.
This schematic illustrates typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system
Schematic illustrating typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system.


This page provides information on design considerations and design criteria for permeable pavement.

Site design considerations

Permeable pavement is subject to the following design considerations, including benefits and constraints.

  • Available Space – A significant advantage of permeable pavement is its ability to combine detention/ infiltration and pavement, thereby reducing or eliminating land required for detention facilities. This is especially important in urban areas with high land prices and highly developed sites with little or no space for stormwater detention.
  • Soils – Soil conditions and infiltration rates determine the need for using an underdrain. Soils in NRCS Hydrologic Soil Groups (HSG) C or D usually require an underdrain, whereas HSG A and B soils often do not. Designers should evaluate existing soil properties during initial site layout with the goal of configuring permeable pavement that conserves and protects soils with the highest infiltration rates. In particular, areas of HSG A or B soils shown on NRCS soil surveys should be considered as primary locations for all types of infiltration.
Soil surveys and NRCS classifications provide a general estimate of the soil's infiltration rate. Soil infiltration rates can also be estimated from soil classifications per ASTM D2487. However, it is best to verify rates using on-site infiltration testing per ASTM D3385 or D5093. In most cases, permeable pavement should not be situated above fill soils. Some designs may require an impermeable liner and an underdrain. Permeable pavements should only be placed on fill soils when laboratory tests indicate the compacted fill will be stable when saturated and that slope stability of deep fills has been verified by a geotechnical engineer.
  • Contributing Drainage Area – Permeable pavements sometimes capture runoff from adjacent areas, pavements, and roofs. The at-grade contributing drainage area into permeable pavement should generally not exceed twice the surface area of the permeable pavement. This guideline helps reduce the rate of surface sedimentation. The 2:1 ratio can be increased if (1) the permeable pavement is receiving runoff from roofs as it tends to be very low in sediment or (2) if runoff from ground level impervious surfaces is expected to remain unburdened with sediment. The best situation is when the design allows for a pre-treatment strip e.g., stone or gravel) to control sediment run-on to the permeable pavement.
  • Soil Subgrade Slope – The slope of the soil subgrade should be as flat as possible (i.e., 0% longitudinal slope) to enable even distribution and infiltration of stormwater. Lateral slopes should be 0%. Steep slopes can reduce the stormwater storage capacity of permeable pavement. Designers should consider using a terraced base designs for permeable pavement in sloped areas, especially when the local slope exceeds 3%.
  • Surface Slope – Surface slopes for all permeable pavement types should be at least 1% to provide an alternate means for drainage should the surface become completely clogged due to lack of maintenance. Designs should provide an alternate means for stormwater to enter the aggregate reservoir if the pavement surface should ever become clogged, or for extreme storm events. For pervious concrete and porous asphalt without curbs, this can be a 2 foot wide stone edge connected to the reservoir. For curbed pavements, inlets may be used.
  • Overflow Structures – Permeable pavements are not designed to store and infiltrate all stormwater from all storms. Therefore, an outlet or outlets are required to prevent water from rising into and over the surface. One type of outlet control would be a catch basin with an internal weir and low-flow orifice. The catch basin can also handle runoff from the surface should it become clogged.
  • Minimum Depth to Seasonal High Water Table – A high groundwater table may cause seepage into the bottom of permeable pavement and prevent complete drainage. Also, soil acts as a filter for pollutants between the bottom of the pavement base and the water table. Therefore, a minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table.
  • Setbacks – To avoid harmful seepage, permeable pavement should not be hydraulically connected to building foundations unless an impermeable liner is placed against the foundation or basement wall. Even under these circumstances, great care should be taken to avoid creating a wet basement problem. If there is no liner, the permeable pavement base should be 10 feet or greater from structures. Again, it is the designer’s responsibility to avoid creating a wet basement problem. Likewise, permeable pavement bases should be hydraulically separated from adjacent road bases.
Permeable pavements without underdrains infiltrate stormwater and should follow requirements for wellhead protection. Underground utility lines are best located away from permeable pavement bases. However, if they need to penetrate the base, consideration should be given to waterproofing (depending on the utility) or possible encasement using low-strength flowable concrete fill. Setbacks can be reduced at the discretion of the local authority for designs that use underdrains and/or liners.
Information: Permeable pavement can be used at highly developed urban sites that have little or no space retention.
Warning: Permeable pavements should be at least a minimum horizontal distance of 100 feet from any municipal water supply well
  • Informed Owner – The property owner should clearly understand the unique maintenance responsibilities inherent with permeable pavement, particularly for parking lot applications. The owner should be capable of performing routine and long-term actions (e.g., vacuuming) to maintain the pavement’s hydrologic functions, and avoid future practices (e.g., winter sanding, seal coating or repaving) that diminish or eliminate them. For porous asphalt a diluted emulsion fog can be used as needed. Maintenance agreements, covenants, maintenance easements or bonds are encouraged between the local authority and the property owner.
  • Limitations – There are several limitations for use of permeable pavement, as summarized below.
    • Permeable pavements should not be used in high pollutant loading sites. High pollutant loading sites are those that will receive constant sediment or trash or debris. Places where fuels and chemicals are stored are handled can be potential stormwater hotspots and permeable pavement should not be constructed in these places. Likewise, areas subject to wind borne dust and sediment should not use permeable pavement unless the pavement be vacuumed regularly.
    • Permeable pavement is suitable for low-volume roads and parking lots. These can be residential collector roads or other applications with similar traffic loads.
    • Permeable pavement can be used in heavily trafficked/high wheel load areas. These applications require specialist pavement engineering to design the pavement section appropriate for the subgrade and loading conditions.

Design criteria

Base/subbase thickness is determined for support traffic using structural design methods and for water storage using hydrologic sizing and/or dynamic modeling over time. The thicker of the two resulting designs is used.

Structural Design

The structural design process for supporting vehicles varies according to the type of pavement selected. The pervious concrete industry is in the process of developing ASTM test methods for characterizing compressive or flexural strengths of pervious concrete. These tests are needed to model fatigue under loads. As an interim step, fatigue equations published by the American Concrete Pavement Association (ACPA 2010) assume such inputs to be comparable in nature (but not magnitude) to those used for conventional concrete pavements. The ACPA design method should be consulted for further information as well as pervious concrete industry software. General guidelines for pervious concrete surface thickness are published by the National Ready Mix Concrete Association and the Portland Cement Association (Leming 2007).

Porous asphalt (Hansen 2008) and permeable interlocking pavements (Smith 2010) use flexible pavement design methods adopted from the 1993 AASHTO Guide for Design of Pavement Structures (AASHTO 1993). In addition, MnDOT design methods, approved mechanistic principles, and manufacturer’s specific recommendations should be consulted.

There has been limited research on full-scale testing of the structural behavior of open-graded bases used under permeable pavements to better characterizing relationships between loads and deformation. Therefore, conservative values (i.e., AASHTO layer coefficients) should be assumed for open-graded base and subbase aggregates in permeable pavement design.

Regardless of type of permeable pavement, structural design methods consider the following in determining surface and base thicknesses to support vehicular traffic:

  • Pavement life and total anticipated traffic loads expressed as 18,000 lb equivalent single axle loads or ESALs (This method of assessing loads accounts for the additional pavement wear caused by trucks.)
  • Soil strength expressed as the soaked California Bearing Ratio (CBR), R-value or resilient modulus (Mr)
  • Strength of the surfacing, base and subbase materials
  • Environmental factors including freezing climates and extended saturation of the soil subgrade

Soil stability under traffic should be carefully reviewed for each application by a qualified geotechnical or civil engineer and lowest anticipated soil strength or stiffness values used for design. Structural design for vehicular applications should generally be on soil subgrades with a CBR (96-hour soaked per ASTM D 1883 or AASHTO T 193) of 4%, or a minimum R-value = 9 per ASTM D 2844 or AASHTO T-190, or a minimum Mr of 6,500 psi (45 MPa) per AASHTO T-307.

Soil compaction required to achieve these soil strengths will reduce the infiltration rate of the soil. Therefore, the permeability or infiltration rate of soil should be assessed at the density required to achieve one of these values. If soils under vehicular traffic have lower strengths than those noted above, or are expansive when wet, there are several options, including

  • use underdrains
  • thicken the base/subbase layer(s)
  • stabilize the base layers with cement or asphalt, and
  • stabilize the soil with lime or cement.

These options are typically used in combination. Pedestrian applications can be placed on lower strength soils than those noted.

Pedestrian applications can be placed on lower strength soils than those noted.

Hydrologic Sizing

Permeable pavement will likely be designed to store more than 1.1 inch of stormwater from the site. In addition, a mix of adjacent pervious and impervious surfaces contributing runoff will require that the base storage volume to hold water depths over 1.1 inches, especially if volume and peak discharge reductions are design objectives. The soil subgrade infiltration rate typically will be less than the flow rate through the pavement, so some reservoir storage will usually be required. When working with HSG A or B soils, designers should initially assume that there is no outflow through underdrains. The following equation can be used to determine the depth of the reservoir layer, assuming runoff fully infiltrates into the underlying soil.

\(D_p = (d_c R) + P – (i/2 t_f) / V_r\)

where

Dp = the depth of the reservoir layer (feet);
dc = the depth of runoff from the contributing drainage area (not including the permeable paving surface) for the design storm (feet);
R = Ac/Ap The ratio of the contributing drainage area (Ac, not including the permeable paving surface) to the permeable pavement surface area (Ap);
P = the rainfall depth for the Treatment Volume (1.1 inch), or other design storm (feet);
i = the field-verified infiltration rate for native soils (feet per day);
tf = the time to fill the reservoir layer (day) – typically 2 hours or 0.083 day; and
Vr</sub> = the void ratio for the reservoir layer (0.4).

The maximum allowable depth of the reservoir layer is constrained by the maximum allowable drain time, which is calculated using the following equation.

\(D_{p-max} = (i/2 t_d) / V_r\)

where

Dp-max = the maximum depth of the reservoir layer (feet); and
td = the maximum allowable time to drain the reservoir layer, typically 1 to 2 days (days)

The following design assumptions apply to the previous equations:

  • The contributing drainage area (Ac) does not contain pervious areas.
  • For design purposes, the native soil infiltration rate (i) should be the field-tested soil infiltration rate divided by a factor of safety of 2.
  • The void ratio (Vr) for the base and subbase stone layers = 0.4.
  • The maximum drain time for the reservoir layer should be not less than 24 hours or greater than 48 hours after the initial 24-hour storm event.

If the depth of the reservoir layer is too great (i.e. dp exceeds dp-max), then the design method typically changes to account for underdrains. The storage volume in the pavements must account for the underlying infiltration rate and outflow through the underdrain. In this case, the design storm should be routed through the pavement to accurately determine the required reservoir depth.

Outflow Rate and Volume Through Underdrains

If the depth of the base/subbase for the full infiltration system is excessive, (i.e. dp exceeds dmax) because, as an example, the design subgrade soil infiltration rate is not adequate to remove the water from the design storm within the designated period of time, then the design should include underdrains. The following procedure is for sizing the base/subbase for partial infiltration designs (i.e. contains underdrains). The same symbols apply, but with the following additions:

qu = outflow through underdrain, ft/hr
k = Coefficient of permeability for each 6 inch diameter underdrain, ft/hr
m = underdrain pipe slope, ft/ft
n = number of underdrain pipes
Tfill = effective filling time of the base/subbase which is at or above the underdrain(s), hours.
T1 = the storage time during which the water is at or above the underdrain(s), hours.
Dbelow = depth of the subbase below the underdrains, ft

Equation 3 can be used to approximate the outflow rate from underdrain(s). This equation is based on Darcy’s Law, which summarizes several properties that groundwater exhibits while flowing in aquifers. Although the hydraulic conductivity (measure of the ease with which water can move through pore spaces of a material) of the aggregate subbase is very high (approximately 17,000 feet/day or 8,500 inches/hour), the discharge rate through underdrains is limited by the cross sectional area of the pipe. As the storage volume above/around the underdrain(s) decreases, i.e., the hydraulic head or water pressure decreases; the base/subbase and in turn the underdrain(s) will drain increasingly slower. To account for this change in flow conditions within the subbase and underdrain(s) over time, a very conservative coefficient of permeability (k) of 100 feet/day 8.33 feet/hour) per pipe can be used to approximate the average underdrain outflow rate.


Equation 3
qu = k x m


Once the outflow rate through each underdrain has been approximated, Equation 4 can be used to determine the depth of the base/subbase needed to store the design storm. To estimate the number of underdrain pipes (n), take the dimension of the parking lot in the direction the pipes are to be placed and divide by the desired spacing between pipes – round down to the nearest whole number.


Equation 4
dp = D QuR + P – fT – qu(Tfil)n / Vr


Tfil = T when the underdrains are at the bottom of the subbase. Tfil = ½T (approximation) when the underdrains are raised.

With full infiltration systems, the maximum allowable drain time (dmax) needs to be calculated to make sure the stored water within the base/subbase does not take too long to infiltrate into the soil subgrade. However, for partial infiltration systems, there is a second method of storage water discharge, namely the underdrains. The depth and number of underdrains are variables that can be adjusted (unlike the infiltration rate into the soil subgrade) so that the actual drain time equals or is less than the maximum allowable drain time. If the discharge of the underdrains is added to Equation 1, then:


Dmax = fTs+ quT1n / Vr = dp


Rearranging the previous creates Equation 5, with the only remaining variable (T1) being on the left hand side.


Equation 5
T1 = / Vr dp–fTs / qun


The elevation of the pipe above the soil subgrade is then calculated using Equation 6.


Equation 6
Dbelow = f(Ts – T1) / Vr


Permeable pavement can also be designed to augment detention storage needed for channel protection and/or flood control. The designer can model various approaches by factoring in storage within the base/subbase, expected infiltration and any outlet structures used as part of the design. For example, some applications in the Chicago, Illinois area are designed to detain and partially infiltrate the 100-year storm for managing combined sewer overflows.

Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet.

Design for Nutrient and TSS Reductions

Permeable pavement nutrient reduction capabilities can be enhanced in partial infiltration designs that detaining water in the base/subbase for over 24 hours for de-nitrification. Any infiltration will reduce the water volumes and mass outflow of nutrients and suspended solids. PICP can use specially coated aggregates in the joints and bedding and all systems can use them in the base to reduce nutrients. Coated aggregates (sometimes called ‘engineered aggregates’) have an effective life of seven to ten years.

A filter layer made of sand or fine aggregate placed under or sandwiched within permeable pavement bases are occasionally used to as a means to reduce nutrients. This layer can be enhanced with iron filings for phosphorous reduction (Erickson 2010). Their effectiveness, initial and maintenance costs should be weighed against other design options for nutrient reductions. Sand filters will incur additional construction expense and this can be reduced by placing sand filters under the subbase at the down slope end of a permeable pavement. The disadvantage of sand filters is that they will eventually require removal and restoration. Therefore concentrating their location in the down slope areas of the site can help reduce future maintenance costs and site disruptions. Simply storing water for and slowly releasing it over 48 hours can be less expensive alternative for nitrogen reduction as long as there is a carbon source in the base/subbase.

A second approach useful for nutrient reduction can occur on sloping sites by creating intermittent berms in the soil subgrade. These enable settlement of suspended solids and encourage de-nitrification. A third alternative is using a “treatment train” approach where a permeable pavement initially filters runoff and the remaining water outflows to bioswales or rain gardens adjacent to the pavement for additional processing and nutrient reduction. There may be additional BMPs used to remove nutrients as the water moves through the watershed.

Soil Infiltration Rate Testing

A minimum of one test per ASTM D3385 or D5093 must be taken per 7,000 square feet of planned permeable pavement surface area. In most cases, a single soil test is sufficient for small-scale applications. At least one soil boring must be taken to confirm the underlying soil properties at the depth where infiltration is designed to occur (i.e., to ensure that the depth to water table, depth to bedrock, or karst is defined). Soil infiltration testing should be conducted within any confining layers that are found within 5 feet of the bottom of a proposed permeable pavement system.

Conveyance and Overflow

Permeable pavement designs should include methods to convey larger storms (e.g., 2-year, 10-year) to the storm drain system. The following is a list of methods that can be used to accomplish this:

  • Place a perforated pipe horizontally near the top of the reservoir layer to pass excess flows after water has filled the base. The placement and/or design should be such that the incoming runoff is not captured (e.g., placing the perforations on the underside only). Pipe placement should be away from wheel loads to prevent damage.
  • Increase the thickness of the top of the reservoir layer.
  • Create underground detention within the reservoir layer of the permeable pavement system. Reservoir storage may be augmented by corrugated metal pipes, plastic or concrete arch structures, etc.
  • Route excess flows to another detention or conveyance system that is designed for management of extreme event flows.
  • Set the storm drain inlets flush with the elevation of the permeable pavement surface to effectively convey excess stormwater runoff past the system. The design should also make allowances for relief of unacceptable ponding depths during larger rainfall events.

Reservoir Layer

The reservoir below the permeable pavement surface should be composed of clean, washed crushed stone aggregate and thickness sized for both the storm event to be stored and the structural requirements of the expected traffic loading. The recommended minimum void ratio should be 40% per ASTM C29. Reservoir base layers for pervious concrete are typically washed ASTM No. 57 stone and those for porous asphalt are ASTM No. 2, 3, or 5. PICP uses ASTM No. 2,3 or 4 stone.

If exposed to vehicular loads, all crushed stone should be MnDOT Class A or B coarse aggregate, minimum 80% crushed, typically granite, basalt, gneiss, trap rock, diabase, gabbro or similar material. The maximum Los Angeles Rattler Loss should be 35% per AASHTO T-96 and no greater loss than 10% per AASHTO T-104 Magnesium Sulfate Soundness Test on the non-igneous portions and as modified by the MnDOT Laboratory Manual (MNDOT 2005). Limestone aggregates not meeting these requirements are not recommended in vehicular applications. Class C and D aggregates may be used in areas subject only to pedestrian traffic.

Underdrains

Underdrains install quickly when placed on or in the soil subgrade, surrounded by stone base or subbase materials. The outflow portion at the end is not perforated and is raised to a designed height allow for some water detention prior to outflow. Placement at this elevation also protects the pipe with aggregate during base compaction. An underdrain(s) can also be installed and capped at a downstream structure as an option for future use if maintenance observations indicate a reduction in the soil permeability.

Maintenance

Some key actions help ensure the long-term performance of permeable pavement. The most frequently cited maintenance problem is surface clogging caused by organic matter and sediment, which can be reduced by the following measures:

  • Observation Well – Typically this consists of a well-anchored, six-inch diameter perforated PVC pipe that extends vertically to the bottom of the reservoir layer. This is installed at the down slope end of the permeable pavement. The observation well should be fitted with a lockable cap installed flush with the ground surface (or under the pavers) to facilitate periodic inspection and maintenance. The observation well is used to observe the rate of drawdown within the reservoir layer following a storm event.
  • Overhead Landscaping – Some communities require a certain percentage of parking lots to be landscaped. Large-scale permeable pavement should be carefully planned to integrate landscaping in a manner that maximizes runoff treatment and minimizes risk of sediment, mulch, grass clippings, crushed leaves, nuts, and fruits inadvertently clogging the surface.

Design specifications

Permeable pavement material specifications vary according to the specific pavement product selected. Note that the size of stone materials used in the reservoir and filter layers may differ depending whether the system is pervious concrete, porous asphalt or permeable interlocking pavers. Designers should consult industry association and manufacturer’s technical specifications for specific criteria and guidance.

Summary of specifications for materials under the pavement surface. For more information, see the footnote (1). Reference or links to any specific commercial product, process, or service by trade name, trademark, service mark, manufacturer, or otherwise does not constitute or imply endorsement, recommendation, or favoring by the Minnesota Pollution Control Agency.
Link to this table

Material
Specification
Notes
Bedding/choker layer
  • Pervious concrete: None
  • Porous asphalt: 1inch of AASHTO No. 57 stone
  • PICP: 2 inches of AASHTO No. 8 stone (MnDOT 3127FA-3)
Washed free of fines
Reservoir Layer
  • Pervious concrete: AASHTO No. 57 stone or per hydraulic design
  • Porous asphalt:AASHTO No. 2, 3, or 5 stone
  • PICP: 4 inches of AASHTO No. 57 base and AASHTO No.2, 3 or 4 stone subbase
Stone layer thickness based on the pavement structural and hydraulic requirements. Stonewashed and free of fines. Recommended minimum void ratio = 0.4.
Underdrain (optional) Use 4 to 6 inch diameter perforated PVC (AASHTO M-252) pipe or corrugated polyethylene pipe. Perforated pipe installed for the full length of the permeable pavement cell, and non-perforated pipe, as needed,connected to storm drainage system.
Filter Layer (optional) Sand filter layeris separated from base above and native soils with geotextile. Sand layer typically ASTM C33 gradation, 6 to 12 inches thick. The Filter Layer is REQUIRED if using the permeable pavement system to meet permit requirements. The sand layer may require a choker layer on surface to provide transition to base layerstone.
Geotextile(optional) Comply with AASHTO M-288 Standard Specification for Geotextile Specification for Highway Applications, drainage and separation applications, Class I or II. Porous asphalt industry recommends non-woven geotextile.
Impermeable Liner Use a minimum 30mil PVC liner covered by 12 ounce/square yard non-woven geotextile. EPDM and HDPE liner material is also acceptable.
Observation Well Use a perforated 4 to 6 inch vertical PVC pipe (AASHTO M-252) with a lockable cap, installedflush with the surface (or under pavers).

1for additional information on materials referenced in this table (e.g. stone dimensions), see the following links:

  • stone size [1]
  • definitions of aggregates [2]
  • information on geotextiles [3]
  • liners 1


This table shows summarizes specifications for permeable pavement.
Link to this table.

Material
Specification
Notes
Permeable Pavers Surface open area: typically 5% to 15%; minimum thickness: 3 inches for vehicles; minimum compressive strength: 8,000 psi Concrete pavers conform to ASTM C936 and clay pavers C1272. Reservoir layer required to support the structural load.
Pervious Concrete
  • Void content: 15% to 35 %
  • Thickness: typically 5 to 8 inches
May not require a reservoir layer to support loads, but a layer is required for storage/infiltration. In no case should plain steel rebar or mesh be used in pervious concrete as this invites corrosion.
Porous Asphalt
  • Void content: 16% to 20 %
  • Thickness: minimum 2.5 inch surface
Reservoir layer contributes to structural load support.


Other design considerations

There are additional design considerations for permeable pavement, including use of permeable pavement in karst terrain and winter considerations.

Karst terrain

A detailed geotechnical investigation may be required for any kind of stormwater design in karst terrain. Permeable pavements, as with other infiltration practices, are not recommended at sites with known karst features as they can cause the formation of sinkholes and can provide a direct link for stormwater to access groundwater without providing any treatment.

Winter considerations

Plowed snow piles should be located in adjacent grassy areas so that sediments and pollutants in snowmelt are partially treated before they reach all permeable pavements. Sand is not recommended for winter traction over permeable pavements. If sand is applied, it must be removed with vacuum cleaning in the spring. Traction can be accomplished on PICP using jointing stone materials, some of which will find its way into the joints by springtime. Deicing material use on permeable pavement is not recommended to minimize build up in soil and outflows. A significant winter advantage or permeable pavements is that they require less deicing materials than their impervious counterparts.