The Minnesota Construction Stormwater permit prohibits infiltration in areas where high levels of contaminants in soil or groundwater will be mobilized by the infiltrating stormwater. At sites not covered by the permit, infiltration should not be used to manage stormwater if contaminants will be mobilized by infiltrating stormwater. Stormwater infiltration that mobilizes contaminants may result in liability concerns.
Some level of investigation should occur before a site is considered inappropriate for infiltration. However, this is balanced against concerns about the cost of investigation and concerns that investigations may trigger a response action if contamination is detected during an investigation.
This page provides information to help determine if stormwater infiltration could mobilize contaminants that may exist at a site. The guidance presents a screening level process that is not intended to confirm the presence or absence of contamination, but identify sites where there is a reasonable potential for contamination to exist and be mobilized by stormwater infiltration. This discussion is not intended for sites with known contamination (see Stormwater management guidelines for sites with on-site contamination or Stormwater management guidelines for sites with off-site contamination).
A checklist was developed to assist in determining whether infiltration could potentially mobilize contaminants at a site. A guidance document was developed to assist in completing the checklist. Additional information that may assist in completing the checklist is provided in the following sections on this page. The checklist and support document can be accessed at the following links.
The goal of this screening assessment is to provide sufficient information to make a determination about whether or not to infiltrate at a site without having to conduct a Phase 1 Environmental Site Assessment (ESA). Phase 1 ESAs are typically recommended at sites that have a reasonable likelihood of being contaminated and involves a review of records, a site inspection, and interviews with owners, occupants, neighbors and local government officials. It may also include some basic sampling.
The following screening assessment is primarily for sites that are less likely or unlikely to have contaminated soils or groundwater. Examples of sites that typically represent low risk are undisturbed lands, residential areas, light commercial areas, and most agricultural areas. Examples of land uses that typically represent low risk or moderate risk are shown in the two photo galleries below. This section provides information and links to resources that can be used to complete a screening assessment and the screening checklist.
If a site has known soil or groundwater contamination, there is a reasonable likelihood that contaminants at the site will be mobilized by stormwater infiltration. For Construction Stormwater permittees, infiltration is prohibited when the infiltration system will be constructed in areas where high levels of contaminants in soil or groundwater will be mobilized by the infiltrating stormwater. If infiltration is pursued at a site with known soil or groundwater contamination, a Phase 1 or Phase 2 investigation should be conducted to confirm the location(s) of contamination and ensure that infiltration will not mobilize the contaminants.
Sites with known contamination include Brownfield sites, Superfund sites, petroleum leak sites or other sites where contamination is known to exist. Tank sites, solid waste sites, and hazardous waste sites do not necessarily have contamination and additional information should be sought to determine if these sites have contaminated soil or groundwater. Available tools include USEPA’s EnviroMapper or the MPCA’s What’s in My Neighborhood (recommended). What’s in My Neighborhood includes contact information for individual sites.
Many contaminated sites have been cleaned up (remediated) to levels where stormwater infiltration is acceptable. The following conditions constitute sites that are likely to be acceptable for stormwater infiltration.
The MPCA provides closure letters at petroleum leaksites that pose no risk to receptors on- or off-site at the time the letter was sent. A closure letter does not guarantee that contamination has been completely removed from a site. See MPCA's Petroleum Remediation Program web page for more information.
The MPCA provides assurance letters at Brownfield sites that pose no risk to receptors on-site. If the MPCA has issued an assurance letter, assume the site has been remediation to acceptable levels. An assurance letter provides no guarantees for off-site contamination. If off-site contamination exists, infiltration is appropriate if adequate separation can be achieved between the infiltration BMP and the off-site contamination. See the section on determining if adequate separation can be achieved between a potential contamination source and the BMP. See MPCA's Brownfields program web page for more information.
Cleanup at sites that have undergone remediation should be documented. For example, remediated sites that are included in MPCA's What's in my Neighborhood? should have associated documents and contact information.
There are several resources available for determining the current and past uses of a specific property. The following information sources and methods are readily available without needing to hire a consultant.
The following sources may provide useful information in completing a property review.
A site visit should be conducted to visibly identify features that may indicate the presence of contamination. This site visit includes a walking survey of the site and all properties within the influence zone of the proposed infiltration practice.The influence zone is the distance from the property boundary at which a groundwater plume from the BMP would not intersect contamination on an adjacent property. For example, using the table to the right, if the soil beneath the BMP was fine sand and the underlying aquifer was coarse sand, the influence zone would be 75 feet. This means during the site visit you would look for potential sources of contamination within 75 feet of your property boundary or the closest boundary of the proposed practice. Any feature detected beyond 75 feet would not be considered a concern for mobilizing contamination as a result of stormwater infiltration. The default influence zone is 500 feet, meaning if you do not know the soil and aquifer material at the site, you would search for the above features within 500 feet of your property boundary.
Influence zone distance (feet) | ||
Soil beneath BMP | Aquifer material | Influence zone distance (feet) |
Default | 500 | |
Any soil | Fine sand or finer | 75 |
Any soil | Unknown | 500 |
Coarse sand | Coarse sand | 150 |
Coarse sand | Gravel | 800 |
Fine sand | Coarse sand | 75 |
Fine sand | Gravel | 500 |
Silt or finer | Coarse sand or finer | 75 |
Silt or finer | Gravel | 150 |
Unregulated fill | Coarse sand | 75 |
Unregulated fill | Gravel | 500 |
The influence zone distance was determined using a USGS groundwater mounding calculator with conservative assumptions (a 300 foot long practice with a maximum ponding depth of 4 feet). Hydraulic conductivity of the aquifer and daily recharge rate were varied to correspond with the soil and aquifer materials shown in the table. The calculator computes the extent of a mound that develops beneath the infiltration BMP. The resulting values were multiplied by a safety factor of 2 to give the influence zone distances. |
Presence of any of the following features may indicate potential contamination.
If groundwater contamination or features that may indicate contamination are identified within the influence zone distance of the proposed infiltration site, a quick analysis of likely groundwater impacts can be made using a simple tool developed by the United States Geological Survey (USGS). This spreadsheet calculates the extent of a groundwater mound that develops beneath an infiltration practice. The maximum extent of groundwater mounding is defined as a 0.25-ft water-level increase at a distance measured from the edge of the hypothetical infiltration basin (see USGS study). It is recommended that the calculated maximum extent of a mound be increased by a safety factor of 2. For example, if it is 50 feet from the edge of a BMP to a point where the underlying mound is 0.25 feet, the minimum acceptable distance from the edge of the mound to a point of contamination is 100 feet (50 times the safety factor of 2). That is, the infiltration practice should be no closer than 100 feet from the point of contamination. If soil on an adjacent site is contaminated but it is uncertain what depth the contamination extends to, assume the contamination extends to the underlying groundwater table (see figure at upper right).
Inputs needed for using the spreadsheet include the following.
For guidance on using the calculator, link here.
Note that identifying the source of groundwater contamination is not the same as identifying the location of contaminated groundwater. If activities on adjacent properties may have resulted in groundwater contamination, determine where potential or actual groundwater plumes exist and determine groundwater flow at the potential infiltration site. This may be done either from information collected at the adjacent site if it exists, or from local groundwater flow maps. Determine whether groundwater contaminants would be mobilized by stormwater infiltration.
For more information see How to predict the extent of a mound. Example applications of this tool can be viewed in this document File:Plume examples 2.docx.
The following examples utilize the above guidance, including the screening assessment (see File:Contamination screening checklist for stormwater infiltration.xlsx).
A bioinfiltration basin (rain garden) is proposed on city land currently used for recreation. Soils in the area of the proposed BMP are fine sands and the aquifer material is coarse sand, giving an Influence zone distance of 75 feet. The surrounding land use within 75 feet of the proposed BMP is single-family residential and a college. Interviews with the property owner indicate the site is not contaminated and has no history of contamination.There are no observed potential sources of contamination on the property. On an adjacent property there a small quantity hazardous waste generator was identified using What's in My Neighborhood. Interviews with the owner of the small quantity hazardous waste generator indicates there is no history of contamination and the potential for contamination is very low. A site visit indicates there are no identified sources of contamination within 75 feet of the proposed BMP. Using the screening checklist, infiltration is deemed appropriate for this site. To see the checklist for this site, follow this link File:Contamination screening checklist for stormwater infiltration.xlsx and click on the worksheet called Example 1.
An existing parking lot will be replaced by a permeable pavement parking. Land use at the site of the proposed BMP is commercial business. The underlying soil is fine sand and the aquifer material is gravel, giving an Influence zone distance of 500 feet. Adjacent land uses (within 500 feet of the proposed BMP) include multiple-family residential, commercial, and industrial. There are also high volume transportation corridors within 500 feet of the proposed BMP. Interviews with the property owner indicate there is no known contamination on the site. Using What's in My Neighborhood, an old tank leak site is identified adjacent to the property. Clicking on the tank site in What's in my Neighborhood and opening the document associated with the site indicates a closure letter was issued by the MPCA 20 years ago indicating the site has been adequately addressed.
The next step is to conduct a site visit. The visit reveals no evidence for contamination. However, industries north of the property are within 500 feet of the proposed BMP. Loading docks are present at one of the industrial facilities. Loading docks represent a potential stormwater hotspot. Using the guidance on potential stormwater hotspots it is determined there are no activities that represent a contamination risk. It is therefore determined that infiltration is appropriate at this site.
Note that we could have conducted a mounding analysis for the BMP to determine if adequate separation could be achieved from the loading dock. This would assume the loading dock was a source of contamination.
To see the checklist for this site, follow this link File:Contamination screening checklist for stormwater infiltration.xlsx and click on the worksheet called Example 2.
As part of a road reconstruction project, a swale with check dams will be constructed on permeable soils, thus allowing for infiltration. The underlying aquifer material is unknown, giving an Influence zone distance of 500 feet. In addition to the road, which is a major transportation route, land use within 500 feet of the swale consists of low density residential, a marina, and a railroad corridor. The site does not have known or past contamination. A site visit indicates there are fuel tanks at the marina and extensive soil staining along the railroad corridor. The fuel tanks are located 150 feet from the swale and, at their closest point, the stained soils are within 75 feet of the swale. Since the railroad has been in operation for several decades and because many different potential sources exist for the stained soils, it is difficult to obtain accurate information about the stained soils without field sampling. Rather than conduct soil sampling we assume the stained soils represent contaminated soil.
Using the County Geologic Atlas for the area, groundwater flow is determined to be toward the river. A mounding analysis is conducted using the USGS mounding calculator with the following inputs.
Using the mounding calculator, we are looking for the distance at which the mounded elevation is 0.25 feet. This is the height considered to be inconsequential for impacting groundwater flow. Using the information above, that distance is 120 feet. Since this is the distance from the center of the swale and we want the distance from the edge of the swale, we subtract 10 feet off this value, giving a distance of 110 feet. We multiply this by the safety factor of 2 to give a distance of 220 feet. This is greater than the distance to the stained soils (75 feet) so we choose not to infiltrate at this site because of the potential for mobilizing contaminants.
Note that contamination has not been confirmed through sampling. If the owner of the BMP wanted to continue pursuing infiltration at this site, a Phase 1 or Phase 2 investigation is highly recommended. Additional investigation would focus on soil and groundwater sampling in the railroad corridor. Alternatively, groundwater modeling could be conducted to determine if infiltrated stormwater would impact groundwater beneath the railroad corridor.
To see the checklist for this site, follow this link File:Contamination screening checklist for stormwater infiltration.xlsx and click on the worksheet called Example 3.
An infiltration BMP is proposed for a site located in a busy commercial area with major transportation corridors. The BMP is proposed for the northeast corner of the site, where there is no history of contamination. However, the western portion of the site is contaminated and has not been remediated. It is therefore appropriate to not infiltrate at this site.
If the owner of the BMP wants to continue pursuing infiltration at this site, a Phase 1 or Phase 2 investigation is highly recommended. This site poses significant risk of mobilizing contamination. In addition to existing known contamination, the nature of the area suggests a high potential for contaminated soils and groundwater. This includes numerous adjacent sites that have a history of contamination. There are also several features on the site that warrant concern, including considerable debris, monitoring wells, stained soils, odors, ponded water, and soil stockpiles.
To see the checklist for this site, follow this link File:Contamination screening checklist for stormwater infiltration.xlsx and click on the worksheet called Example 4.
The purpose of the screening guidance presented above was to identify sites where there is a reasonable likelihood that contaminants in soil and/or groundwater would be mobilized by infiltrated stormwater. The screening approach does not verify the presence of contamination and therefore represents a conservative approach to infiltrating stormwater.
The following discussion is aimed at individuals or entities who want to conduct additional site investigation to determine if infiltration is feasible at a site. It is recommended that a Phase 1 or Phase 2 environmental site assessment be conducted at this point.
If you choose to continue pursuing infiltration at this point, a Phase 1 ESA is recommended. A qualified consultant should undertake and complete the investigation. Examples of qualified individuals include the following:
If there is any reason to suspect soil or groundwater may be contaminated at a site, or if the current or recent land use is associated with activities involving potential contaminants, a Phase 1 ESA should be completed by a professional consultant. Industrial areas and areas where gas stations or dry cleaners are present are examples of areas where a Phase 1 ESA is recommended. The purpose of a Phase I ESA is to identify recognized environmental conditions that may exist on a site and assess whether any environmental impacts were likely present based on current and/or past on-site activities. Sources of information for determining site contamination are available from both the American Society for Testing and Materials (ASTM) and USEPA. These agencies provide information on the basics of performing Phase I Environmental Site Assessments (ESA). An ESA is conducted in accordance with the current ASTM Practice E 1527-13, Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, and 40 CFR Part 312, Standards and Practices for All Appropriate Inquiries. At a minimum, a Phase I ESA should include the following.
The following sources may provide useful information in completing a Phase 1 ESA.
If sources or potential sources of contamination are determined through a Phase I ESA, stormwater infiltration should not be considered unless a Phase II ESA is conducted.
If sources or potential sources of contamination are determined through a Phase I ESA, stormwater infiltration should not be considered unless a Phase II ESA is conducted. During a Phase II Site Assessment, surface soil, subsurface soil, and groundwater samples are collected for laboratory analysis. The results should be compared to applicable standards to determine if the site needs to be classified as contaminated. This section provides a summary and step-by-step process for conducting a Phase 2 ESA. Links to detailed information are included. A workplan should be prepared by a qualified professional. The workplan should include a detailed description of sampling methods, sampling equipment, sample analysis (including laboratory and field analysis), quality assurance procedures, a site safety and contingency plan, and a schedule. Because the purpose of this investigation is to determine if stormwater infiltration is feasible, the Phase 2 investigation only includes soil and groundwater sampling. However, if contamination is found at the site, other regulatory requirements may apply.
Identifying potential contaminants of concern (COC) can save considerable cost associated with laboratory analysis. Different types of sites vary in their likely COCs. For more information, see here.
The following procedure can be utilized for soil investigations.
The following procedure can be utilized for groundwater investigations. Because of the expense involved in groundwater sampling, it is important to identify the source of contamination. Groundwater sampling should not be conducted until soil sampling has been completed at the site. Groundwater sampling may need to be completed in phases until the extent of any plume on the site can be defined.
A Supplemental Site Assessment may be needed if pollutants detected during a Phase II are present at an unacceptable level. This level will be determined by local and federal regulations. The purpose of the supplemental site assessment is to determine the horizontal and vertical extent of the contamination. At this point in the investigation process, it is advisable to contact the MPCA for technical assistance. Information on MPCA's role in providing technical assistance and liability assurances, including contact information, is described in this guidance document.
A concern with infiltrating stormwater through or into contaminated soils or groundwater is potential liability for a contaminant release. Minnesota statute 115B.03 defines the conditions under which a person may be associated with a release of a hazardous substance, pollutant, or contaminant from a facility. Specifically, "An owner of real property is not a person responsible for the release or threatened release of a hazardous substance from a facility in or on the property unless that person: ... (4) knew or reasonably should have known that a hazardous substance was located in or on the facility at the time right, title, or interest in the property was first acquired by the person and engaged in conduct associating that person with the release; or (5) took action which significantly contributed to the release after that person knew or reasonably should have known that a hazardous substance was located in or on the facility."
Thus, a person or party becomes liable only when a release occurs. In a case where a site investigation reveals the presence of contamination, but no release occurs, liability assurances can be given. These are explained in this guidance document. Specifically, the MPCA may provide No Association Determinations (NAD) or Off-site Source Determinations.
Each of these determinations is contingent on certain site conditions, which are described in detail in this guidance document.