Item | Corrective Action Required if | Corrective Action |
---|---|---|
Ditch checks (see also sediment control logs) | Sediment control logs not properly trenched, staked, or both
Not stapled properly for blanket and sediment control log system Water flows around the end rather than over the middle Incorrect spacing of checks No geotextile liner used for rock weeper system or rock checks Wrong one installed for intended or plan application |
Remove sediment control logs and provide trench, and angle stake as per detail
Add more staples as per detail Extend length of log where end is higher than middle Add more checks following spacing detail Remove rock and add geotextile Remove improper check and install as per plan or amendment |
Sediment control logs | Not staked properly resulting in undermining or movement of logs
Log ends not overlapped when more than one is needed in a line |
Install additional stakes
Reconfigure logs for overlap |