Construction site BMPs and their function and control mechanisms
Link to this table
BMP function | BMP types | Erosion prevention (EP) or sediment control (SC) mechanism |
---|---|---|
Planning | Planning, sequencing, and scheduling | Minimize bare area and exposure period (EP) |
Preservation and protection designation | ||
Land clearing planning and staging | ||
Land grading planning and staging | ||