Project: |
Location: |
Site Status: |
Date: |
Time: |
Inspector: |
Construction Sequence |
Satisfactory / Unsatisfactory |
Comments |
1. Pre-Construction |
Pre-construction meeting |
|
|
Runoff diverted |
|
|
Soil permeability verified |
|
|
Groundwater / bedrock verified |
|
|
Project benchmark established |
|
Facility location staked out |
|
|
Temporary erosion and sediment control established |
|
|
2. Excavation |
Size and location per plans |
|
|
Side slopes stable |
|
|
Depth adjusted to soil layer with specified soil type and permeability |
|
|
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence |
|
|
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence |
|
|
3. Filter Fabric Placement |
Fabric per specificationss |
|
|
Placed per plan location |
|
|
4. Aggregate Material |
Size as specified |
|
|
Clean / washed material |
|
|
Placed properly |
|
|
5. Observation Well |
Pipe size per plans |
|
|
Under-drain installed per plans |
|
|
Inlet installed per plans |
|
|
Pre-treatment devices installed per plans |
|
|
6. Vegetation |
Complies with planting specifications |
|
|
Topsoil complies with composition and placement in specifications |
|
|
Permanent erosion control measures in place |
|
|
7. Final Inspection |
Dimensions per plans |
|
|
Check dams operational |
|
|
Inlet / outlet operational |
|
|
Effective stand of vegetation and stabilization |
|
|
Contributing watershed stabilized before flow is routed to the facility |
|
|
Comments:
|
Actions to be taken:
|