Unit costs related to diversion and working in the dry
Link to this table
Bid Item | Item Description | Units | Average Price |
---|---|---|---|
2105601/00045 | Temporary stream diversion system | lump sum | $27,523.34 |
2452601/00011 | Steel sheet piling (temporary) | lump sum | $31,747.97 |
2452618/00011 | Steel sheet piling (temporary) | square foot | $37.64 |