A unified framework is presented for addressing stormwater sizing criteria in the context of the MPCA Construction General Permit (CGP) and local stormwater management requirements, if chosen by the local community. The unified approach addresses five different sizing criteria, as shown below.
The individual articles comprising this section on Unified sizing criteria may be viewed as a single article.
This page was last edited on 6 December 2022, at 19:14.