Line 5: Line 5:
  
 
===24.2===  
 
===24.2===  
<big>The <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">[https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_Section_27_Definitions#27.7 Commissioner]</span> may require the permittee to modify the SWPPP as needed, in accordance with the procedures of Minn.
+
<big>The <span title="The Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">'''Commissioner'''</span> may require the <span title="A person or persons, that signs the permit application submitted to the Agency and is responsible for compliance with the terms and conditions of the General Permit."> '''permittee'''</span> to modify the <span title="A comprehensive program developed by the permittee to manage and reduce the discharge of pollutants in stormwater to and from the small MS4.">'''SWPPP'''</span> as needed, in accordance with the procedures of [https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001], and may consider the following factors:
R. 7001, and may consider the following factors:
 
  
:a. discharges from the MS4 are impacting the quality of receiving waters;
+
:a. discharges from the [https://stormwater.pca.state.mn.us/index.php?title=What_is_a_municipal_separate_storm_sewer_system_(MS4)%3F MS4] are impacting the quality of <span title="Any lake, river, stream or wetland that receives stormwater discharges from an MS4.">'''receiving waters'''</span>;
  
 
:b. more stringent requirements are necessary to comply with state or federal regulations; and
 
:b. more stringent requirements are necessary to comply with state or federal regulations; and
Line 15: Line 14:
  
 
===24.3===  
 
===24.3===  
<big>Modifications that the permittee chooses to make to the SWPPP other than modifications authorized in item 24.4, must be
+
<big>Modifications that the permittee chooses to make to the <span title="A comprehensive program developed by the permittee to manage and reduce the discharge of pollutants in stormwater to and from the small MS4.">'''SWPPP'''</span> other than modifications authorized in item 24.4, must be
 
approved by the <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">[https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_Section_27_Definitions#27.7 Commissioner]</span> in accordance with the procedures of Minn. R. 7001. All requests must be in writing, setting
 
approved by the <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">[https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_Section_27_Definitions#27.7 Commissioner]</span> in accordance with the procedures of Minn. R. 7001. All requests must be in writing, setting
 
forth schedules for compliance. The request must discuss alternative program modifications, assure compliance with
 
forth schedules for compliance. The request must discuss alternative program modifications, assure compliance with

Revision as of 19:02, 5 March 2021

Section 24 Stormwater Pollution Prevention Program (SWPPP) Modification

24.1

Stormwater Pollution Prevention Program (SWPPP) Modification. [Minn. R. 7090]

24.2

The Commissioner may require the permittee to modify the SWPPP as needed, in accordance with the procedures of Minn. R. 7001, and may consider the following factors:

a. discharges from the MS4 are impacting the quality of receiving waters;
b. more stringent requirements are necessary to comply with state or federal regulations; and
c. additional conditions are deemed necessary to comply with the goals and applicable requirements of the Clean Water Act and protect water quality [Minn. R. 7090]

24.3

Modifications that the permittee chooses to make to the SWPPP other than modifications authorized in item 24.4, must be approved by the Commissioner in accordance with the procedures of Minn. R. 7001. All requests must be in writing, setting forth schedules for compliance. The request must discuss alternative program modifications, assure compliance with requirements of the permit, and meet other applicable laws. [Minn. R. 7090]

24.4

The permittee may modify the SWPPP without prior approval of the Commissioner provided the Commissioner is notified of the modification in the annual report for the year the modification is made and the modification falls under one of the following categories:

a. a BMP is added, and none subtracted, from the SWPPP; or
b. a less effective BMP is replaced with a more effective BMP. The alternate BMP must address the same, or similar, concerns as the ineffective or failed BMP. [Minn. R. 7090]