(One intermediate revision by the same user not shown)
Line 20: Line 20:
 
===5.5===  
 
===5.5===  
 
<big>Upon receipt of written notification of final approval of the application from the <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">'''Commissioner'''</span>, the applicant is authorized to discharge <span title="Stormwater runoff, snow melt runoff, and surface runoff and drainage.">'''stormwater'''</span> from the small [https://stormwater.pca.state.mn.us/index.php?title=What_is_a_municipal_separate_storm_sewer_system_(MS4)%3F MS4] under the terms and conditions of the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf General Permit]. [[https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001]]</big>
 
<big>Upon receipt of written notification of final approval of the application from the <span title="the Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee">'''Commissioner'''</span>, the applicant is authorized to discharge <span title="Stormwater runoff, snow melt runoff, and surface runoff and drainage.">'''stormwater'''</span> from the small [https://stormwater.pca.state.mn.us/index.php?title=What_is_a_municipal_separate_storm_sewer_system_(MS4)%3F MS4] under the terms and conditions of the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf General Permit]. [[https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001]]</big>
 +
 +
<noinclude>
 +
[[Category:Level 2 - Regulatory/Municipal (MS4)]]
 +
</noinclude>

Latest revision as of 17:43, 22 November 2022

Section 5 Permit Authorization

5.1

Permit Authorization. [Minn. R. 7001]

5.2

The applicant must submit a complete application in accordance with Sections 9 through 12 in order to obtain authorization to discharge stormwater from a small MS4 under the General Permit. [Minn. R. 7001]

5.3

The Commissioner reviews the General Permit application for completeness. After review, the Commissioner will do one of the following:

a. if an application is determined to be incomplete, the Commissioner will notify the applicant in writing, indicate why the application is incomplete, and request that the applicant resubmit the application; or
b. if an application is determined to be complete, the Commissioner will make a preliminary determination as to whether coverage under the General Permit should be issued or denied in accordance with Minn. R. 7001. [Minn. R. 7001]

5.4

The Commissioner provides a public notice with the opportunity for a hearing on the preliminary determination to issue coverage under the General Permit. [Minn. R. 7001]

5.5

Upon receipt of written notification of final approval of the application from the Commissioner, the applicant is authorized to discharge stormwater from the small MS4 under the terms and conditions of the General Permit. [Minn. R. 7001]

This page was last edited on 22 November 2022, at 17:43.