m
m
Line 19: Line 19:
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td>Periodically remove sediment by back-flushing water and vacuuming manhole sump</td>
+
<td>Periodically remove sediment by back-flushing water and vacuuming manhole sump [https://www.stormtech.com/download_files/pdf/manual_iso_row.pdf]</td>
 
<td></td>
 
<td></td>
 
<td>Vacuum truck</td>
 
<td>Vacuum truck</td>
Line 26: Line 26:
 
<td>StormTech Isolator Row</td>
 
<td>StormTech Isolator Row</td>
 
<td>Installation instructions [https://www.stormtech.com/download_files/pdf/manual_installation_instructions_310740780.pdf available here].</td>
 
<td>Installation instructions [https://www.stormtech.com/download_files/pdf/manual_installation_instructions_310740780.pdf available here].</td>
<td>At least every 6 months for first year of operation, then varies by location</td>
+
<td>At least every 6 months for first year of operation, then varies by location [https://www.stormtech.com/download_files/pdf/manual_iso_row.pdf]</td>
 
<td>[https://www.stormtech.com/download_files/pdf/manual_iso_row.pdf Step by step maintenance procedures]</td>
 
<td>[https://www.stormtech.com/download_files/pdf/manual_iso_row.pdf Step by step maintenance procedures]</td>
 
<td></td>
 
<td></td>
<td>Clean-out when average depth of sediment exceeds 3 inches</td>
+
<td>Clean-out when average depth of sediment exceeds 3 inches [https://www.stormtech.com/download_files/pdf/manual_iso_row.pdf]</td>
 
<td></td>
 
<td></td>
<td>Vacuum/JetVac combination vehicle</td>
+
<td>Vacuum/JetVac combination vehicle [https://www.stormtech.com/download_files/pdf/manual_iso_row.pdf]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 39: Line 39:
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td>Remove sediment once depth reaches 6 inches or more</td>
+
<td>Remove sediment once depth reaches 6 inches or more [https://your.kingcounty.gov/dnrp/library/water-and-land/stormwater/Drainage-Maintenace-Standards-Commercial-Multifamily-Drainage-Facilities/09_ComDrainBook.pdf]</td>
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
Line 46: Line 46:
 
<td>Oil/water/grit separators</td>
 
<td>Oil/water/grit separators</td>
 
<td></td>
 
<td></td>
<td>After every major storm but at least once per month</td>
+
<td>After every major storm but at least once per month [http://prj.geosyntec.com/npsmanual/oilgritseparators.aspx]</td>
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td>Clean out at least twice per year</td>
+
<td>Clean out at least twice per year [http://prj.geosyntec.com/npsmanual/oilgritseparators.aspx]</td>
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
Line 56: Line 56:
 
<td>Hydro Dry Screen</td>
 
<td>Hydro Dry Screen</td>
 
<td></td>
 
<td></td>
<td>Every 3-6 months during first year, then site specific</td>
+
<td>Every 3-6 months during first year, then site specific [https://www.hydro-int.com/sites/default/files/hds_om_manual_a1604.pdf]</td>
<td>[https://www.hydro-int.com/sites/default/files/hds_om_manual_a1604.pdf Maintenance and inspection checklist]</td>
+
<td>[https://www.hydro-int.com/sites/default/files/hds_om_manual_a1604.pdf Maintenance and inspection checklist] [https://www.hydro-int.com/sites/default/files/hds_om_manual_a1604.pdf]</td>
 
<td></td>
 
<td></td>
<td>Remove sediment once depth exceeds maximum clean-out depth</td>
+
<td>Remove sediment once depth exceeds maximum clean-out depth [https://www.hydro-int.com/sites/default/files/hds_om_manual_a1604.pdf]</td>
 
<td></td>
 
<td></td>
 
<td>Vacuum truck</td>
 
<td>Vacuum truck</td>
Line 66: Line 66:
 
<td>Suntree Nutrient Separating Baffle Box (NSBB)</td>
 
<td>Suntree Nutrient Separating Baffle Box (NSBB)</td>
 
<td></td>
 
<td></td>
<td>After each runoff event initially, then at least quarterly. Local and State regulation may require every 90 days</td>
+
<td>After each runoff event initially, then at least quarterly. Local and State regulation may require every 90 days [https://www.suntreetech.com/uploads/1/1/4/5/114586811/nsbb_operations_manual_v1.0.pdf]</td>
<td>[https://www.suntreetech.com/uploads/1/1/4/5/114586811/nsbb_operations_manual_v1.0.pdf Inspection and maintenance checklist]</td>
+
<td>[https://www.suntreetech.com/uploads/1/1/4/5/114586811/nsbb_operations_manual_v1.0.pdf Inspection and maintenance checklist]; [https://www.suntreetech.com/uploads/1/1/4/5/114586811/nsbb_operations_manual_v1.0.pdf]</td>
 
<td></td>
 
<td></td>
<td>Vacuum out sediment chambers when sediment accumulation exceeds 50% storage volume</td>
+
<td>Vacuum out sediment chambers when sediment accumulation exceeds 50% storage volume [https://www.suntreetech.com/uploads/1/1/4/5/114586811/nsbb_operations_manual_v1.0.pdf]</td>
 
<td></td>
 
<td></td>
 
<td>Vacuum truck</td>
 
<td>Vacuum truck</td>
Line 76: Line 76:
 
<td>Manhole Baffle Box</td>
 
<td>Manhole Baffle Box</td>
 
<td></td>
 
<td></td>
<td>Frequently for first two years following installation, then site specific</td>
+
<td>Frequently for first two years following installation, then site specific [https://stormwater.pca.state.mn.us/index.php?title=Flow-through_structures_for_pre-treatment]</td>
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td>Fully cleaned at least once per year</td>
+
<td>Fully cleaned at least once per year [https://stormwater.pca.state.mn.us/index.php?title=Flow-through_structures_for_pre-treatment]</td>
 
<td></td>
 
<td></td>
<td>Vacuum truck; One half day; Average cost $450</td>
+
<td>Vacuum truck; One half day; Average cost $450 [https://stormwater.pca.state.mn.us/index.php?title=Flow-through_structures_for_pre-treatment]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Environment 21 StormPro</td>
 
<td>Environment 21 StormPro</td>
 
<td></td>
 
<td></td>
<td>At least quarterly until a more accurate schedule can be determined</td>
+
<td>At least quarterly until a more accurate schedule can be determined [https://www.njstormwater.org/pdf/StormPro_Certification_20150120.pdf]</td>
 
<td>[https://www.njstormwater.org/pdf/StormPro_Certification_20150120.pdf Maintenance data sheet]</td>
 
<td>[https://www.njstormwater.org/pdf/StormPro_Certification_20150120.pdf Maintenance data sheet]</td>
 
<td></td>
 
<td></td>
<td>Sediment should be removed when sediment depth in first chamber is 50% of design sediment storage depth or at least once per year</td>
+
<td>Sediment should be removed when sediment depth in first chamber is 50% of design sediment storage depth or at least once per year [https://www.njstormwater.org/pdf/StormPro_Certification_20150120.pdf]</td>
 
<td></td>
 
<td></td>
<td>Truck-mounted sewer and catch basin cleaner with vacuum pump</td>
+
<td>Truck-mounted sewer and catch basin cleaner with vacuum pump [https://www.njstormwater.org/pdf/StormPro_Certification_20150120.pdf]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>BaySeparator by BaySaver  </td>
 
<td>BaySeparator by BaySaver  </td>
 
<td></td>
 
<td></td>
<td>At least every 6 months initially, then site specific</td>
+
<td>At least every 6 months initially, then site specific [https://baysaver.com/wp-content/uploads/2018/04/BaySeparator-Technical-and-Design-Manual.pdf]</td>
 
<td>[https://baysaver.com/wp-content/uploads/2018/04/BaySeparator-Technical-and-Design-Manual.pdf Maintenance instructions]</td>
 
<td>[https://baysaver.com/wp-content/uploads/2018/04/BaySeparator-Technical-and-Design-Manual.pdf Maintenance instructions]</td>
 
<td></td>
 
<td></td>
<td>Cleaning recommended every 12-36 months or when 2 feet of sediment have accumulated</td>
+
<td>Cleaning recommended every 12-36 months or when 2 feet of sediment have accumulated [https://baysaver.com/wp-content/uploads/2018/04/BaySeparator-Technical-and-Design-Manual.pdf]</td>
 
<td></td>
 
<td></td>
<td>Vacuum truck</td>
+
<td>Vacuum truck [https://www.ads-pipe.com/products/water-quality/barracuda-storm-water-separator]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Sump Manhole with SAFL Baffle</td>
 
<td>Sump Manhole with SAFL Baffle</td>
<td>45 minute installation</td>
+
<td>45 minute installation [https://upstreamtechnologies.us/docs/Upstream_SAFL_Brochure.pdf]</td>
 
<td>Three times per year for first two years</td>
 
<td>Three times per year for first two years</td>
 
<td></td>
 
<td></td>
Line 111: Line 111:
 
<td>Sediment removed before it reaches the bottom of the SAFL baffle</td>
 
<td>Sediment removed before it reaches the bottom of the SAFL baffle</td>
 
<td></td>
 
<td></td>
<td>Vacuum truck</td>
+
<td>Vacuum truck [https://upstreamtechnologies.us/docs/SAFL-Baffle-Design-Guide.pdf]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Deep sump catch basin</td>
 
<td>Deep sump catch basin</td>
 
<td></td>
 
<td></td>
<td>Four times per year and at the end of foliage and snow- removal seasons</td>
+
<td>Four times per year and at the end of foliage and snow- removal seasons [http://prj.geosyntec.com/npsmanual/deepsumpcatchbasin.aspx]</td>
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td>Four times per year or when deposit depth is greater than ½ depth from bottom of invert to lowest pipe</td>
+
<td>Four times per year or when deposit depth is greater than ½ depth from bottom of invert to lowest pipe [http://prj.geosyntec.com/npsmanual/deepsumpcatchbasin.aspx]</td>
 
<td>Hood required</td>
 
<td>Hood required</td>
<td>Vacuum truck or clamshell bucket</td>
+
<td>Vacuum truck or clamshell bucket [http://prj.geosyntec.com/npsmanual/deepsumpcatchbasin.aspx]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Forebay/pre-settling basin</td>
 
<td>Forebay/pre-settling basin</td>
 
<td>Hard floor (concrete or grouted stone) allows definition of bottom and ease of maintenance. Provide appropriate stabilized maintenance access for heavier equipment at no more than 2% cross slope and no more than 10% longitudinal slope</td>
 
<td>Hard floor (concrete or grouted stone) allows definition of bottom and ease of maintenance. Provide appropriate stabilized maintenance access for heavier equipment at no more than 2% cross slope and no more than 10% longitudinal slope</td>
<td>Monthly</td>
+
<td>Monthly [http://prj.geosyntec.com/npsmanual/sedimentforebays.aspx]</td>
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td>Four times per year or when sediment depth is >3 ft. A hard bottom such as concrete facilitates removal, during design ensure forebay is vehicle accessible</td>
+
<td>Four times per year or when sediment depth is >3 ft. A hard bottom such as concrete facilitates removal, during design ensure forebay is vehicle accessible [http://prj.geosyntec.com/npsmanual/sedimentforebays.aspx]; [https://stormwater.pca.state.mn.us/index.php?title=Design_criteria_for_stormwater_ponds]</td>
<td>Forebay should be designed to withstand 2-yr and 10-yr velocities without scouring</td>
+
<td>Forebay should be designed to withstand 2-yr and 10-yr velocities without scouring [http://prj.geosyntec.com/npsmanual/sedimentforebays.aspx]</td>
 
<td>Vacuum truck skid-loader, or backhoe</td>
 
<td>Vacuum truck skid-loader, or backhoe</td>
 
</tr>
 
</tr>
 
</table>
 
</table>

Revision as of 18:49, 3 June 2019

Above ground and below grade storage and settling - installation and maintenance recommendations
Link to this table

Device Installation notes Frequency of inspections Maintenance checklist (link) Permitted on private land/ Maintenance agreement recommended Practices for minimizing sediment and trash buildup Practices for minimizing erosion Cost considerations (equipment needed and man hours)
Pretreatment row on underground storage/filtration no data At least every 6 months for first year of operation, then varies by location Periodically remove sediment by back-flushing water and vacuuming manhole sump [1] Vacuum truck
StormTech Isolator Row Installation instructions available here. At least every 6 months for first year of operation, then varies by location [2] Step by step maintenance procedures Clean-out when average depth of sediment exceeds 3 inches [3] Vacuum/JetVac combination vehicle [4]
Settling chamber/vault Remove sediment once depth reaches 6 inches or more [5]
Oil/water/grit separators After every major storm but at least once per month [6] Clean out at least twice per year [7]
Hydro Dry Screen Every 3-6 months during first year, then site specific [8] Maintenance and inspection checklist [9] Remove sediment once depth exceeds maximum clean-out depth [10] Vacuum truck
Suntree Nutrient Separating Baffle Box (NSBB) After each runoff event initially, then at least quarterly. Local and State regulation may require every 90 days [11] Inspection and maintenance checklist; [12] Vacuum out sediment chambers when sediment accumulation exceeds 50% storage volume [13] Vacuum truck
Manhole Baffle Box Frequently for first two years following installation, then site specific [14] Fully cleaned at least once per year [15] Vacuum truck; One half day; Average cost $450 [16]
Environment 21 StormPro At least quarterly until a more accurate schedule can be determined [17] Maintenance data sheet Sediment should be removed when sediment depth in first chamber is 50% of design sediment storage depth or at least once per year [18] Truck-mounted sewer and catch basin cleaner with vacuum pump [19]
BaySeparator by BaySaver At least every 6 months initially, then site specific [20] Maintenance instructions Cleaning recommended every 12-36 months or when 2 feet of sediment have accumulated [21] Vacuum truck [22]
Sump Manhole with SAFL Baffle 45 minute installation [23] Three times per year for first two years Sediment removed before it reaches the bottom of the SAFL baffle Vacuum truck [24]
Deep sump catch basin Four times per year and at the end of foliage and snow- removal seasons [25] Four times per year or when deposit depth is greater than ½ depth from bottom of invert to lowest pipe [26] Hood required Vacuum truck or clamshell bucket [27]
Forebay/pre-settling basin Hard floor (concrete or grouted stone) allows definition of bottom and ease of maintenance. Provide appropriate stabilized maintenance access for heavier equipment at no more than 2% cross slope and no more than 10% longitudinal slope Monthly [28] Four times per year or when sediment depth is >3 ft. A hard bottom such as concrete facilitates removal, during design ensure forebay is vehicle accessible [29]; [30] Forebay should be designed to withstand 2-yr and 10-yr velocities without scouring [31] Vacuum truck skid-loader, or backhoe