(Created page with "<font size=3>'''Construction Stormwater Permit Notice of Termination and Site Closeout Checklist'''.</font size><br> Link to this Construction Stormwater Permit Notice of Te...") |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 5: | Line 5: | ||
<tr> | <tr> | ||
<th>Final inspection and site closeout elements</th> | <th>Final inspection and site closeout elements</th> | ||
− | <th>*Site is stabilized with vegetation | + | <th> |
+ | *Site is stabilized with vegetation | ||
*Drainage system is stable and functional | *Drainage system is stable and functional | ||
*Temporary BMPs have been removed | *Temporary BMPs have been removed | ||
Line 13: | Line 14: | ||
<tr> | <tr> | ||
<td>Site stabilization closeout</td> | <td>Site stabilization closeout</td> | ||
− | <td>*No large patches or areas of bare soil or dead vegetation on site | + | <td> |
+ | *No large patches or areas of bare soil or dead vegetation on site | ||
*At least 70 percent uniform vegetated cover is established in all areas | *At least 70 percent uniform vegetated cover is established in all areas | ||
*Slopes are stable, with no significant rills/ruts | *Slopes are stable, with no significant rills/ruts | ||
Line 22: | Line 24: | ||
<tr> | <tr> | ||
<td>Drainage system closeout</td> | <td>Drainage system closeout</td> | ||
− | <td>*Stormwater pipes, ditches, etc. checked for conformance with design plans | + | <td> |
+ | *Stormwater pipes, ditches, etc. checked for conformance with design plans | ||
*Manholes, pipes, catch basins, headwalls, and concrete flumes checked for alignment, integrity, etc. | *Manholes, pipes, catch basins, headwalls, and concrete flumes checked for alignment, integrity, etc. | ||
*No significant sediment accumulations in pipes, ditches, and catch basins | *No significant sediment accumulations in pipes, ditches, and catch basins | ||
Line 30: | Line 33: | ||
<tr> | <tr> | ||
<td>Temporary BMP removal</td> | <td>Temporary BMP removal</td> | ||
− | <td>*Silt fencing, posts, and accumulated sediment | + | <td> |
+ | *Silt fencing, posts, and accumulated sediment | ||
*Non-degradable sediment barriers | *Non-degradable sediment barriers | ||
*Inlet protection devices (rock, rock bags, filter fabric, proprietary products) | *Inlet protection devices (rock, rock bags, filter fabric, proprietary products) | ||
Line 44: | Line 48: | ||
<tr> | <tr> | ||
<td>Good housekeeping closeout</td> | <td>Good housekeeping closeout</td> | ||
− | <td>*Litter and trash pickup / cleanup over entire site | + | <td> |
+ | *Litter and trash pickup / cleanup over entire site | ||
*Removal of debris and waste piles | *Removal of debris and waste piles | ||
*Removal of fuel tanks and other fueling/maintenance items/equipment | *Removal of fuel tanks and other fueling/maintenance items/equipment | ||
Line 53: | Line 58: | ||
</tr> | </tr> | ||
</table> | </table> | ||
+ | |||
+ | <noinclude> | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Construction stormwater]] | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Costs, benefits]] | ||
+ | </noinclude> |
Construction Stormwater Permit Notice of Termination and Site Closeout Checklist.
Link to this table
Final inspection and site closeout elements |
|
---|---|
Site stabilization closeout |
|
Drainage system closeout |
|
Temporary BMP removal |
|
Good housekeeping closeout |
|
This page was last edited on 4 August 2022, at 19:05.