Line 1: Line 1:
 
+
<font size=3>Cost components for filtration practices'''.</font size><br>
 
+
Link to this [[Cost components for filtration practices|table]]
<center><font size=3>'''This table shows cost components for filtration practices'''.</font size><br>
 
Link to this [[Cost components for filtration practices|table]]</center>
 
 
<table class="sortable">
 
<table class="sortable">
 
 
<tr>
 
<tr>
 
<th>Implementation Stage</th>
 
<th>Implementation Stage</th>
Line 97: Line 94:
 
<td>Mowing Cost ($) x Mowing Frequency (4x / 1 yr)</td>
 
<td>Mowing Cost ($) x Mowing Frequency (4x / 1 yr)</td>
 
</tr>
 
</tr>
 +
</table>
  
</table>
 
 
[[category:table]]
 
[[category:table]]

Revision as of 13:24, 18 March 2013

Cost components for filtration practices.
Link to this table

Implementation Stage Primary Cost Components Basic Cost Estimate Other Considerations
Site Preparation Tree & plant protection Protection Cost ($/acre) x Affected Area (acre) Removal of existing structures, topsoil removal and stockpiling
Topsoil salvage Salvage cost ($/acre) x Affected Area (acre)
Clearing & grubbing Clearing Cost ($/acre) x Affected Area (acre)
Site Formation Excavation / grading X-ft Depth Excavation Cost ($/acre) x Area (acre) Soil & rock fill Hauling material material, tunneling
Hauling material offsite Excavation Cost x (% of Material to be hauled away)
Structural Components Under-drains Under-drain cost ($/lineal foot) x length of device Pipes, catchbasins, manholes, valves, vaults
Vault structure (for media filters) ($/structure)
Media (for media filters) Media cost ($/cubic yard) X filter volume (cubic yard)
Inlet structure (for vegetative filters ($/structure)
Outlet structure (for vegetative filters) ($/structure)
Site Restoration Filter strip Sod cost ($/square foot) x filter strip area Tree protection, soil amendments, seed bed preparation, trails
Soil preparation Topsoil or amendment cost ($/acre) x Area (acre)
Seeding Seeding Cost ($/acre) x Seeded Area (acre)
Planting / transplanting Planting Cost ($/acre) x Planted Area (acre)
Annual Operation, Maintenance, and Inspection Debris removal Removal Cost ($/acre) x Area (acre) x Frequency (2x / 1yr) Vegetation maintenance, cleaning of structures
Sediment removal Removal Cost ($/acre) x Area (acre) x Frequency (1x / 5yr)
Gate / valve operation Operation Cost ($) x Operation Frequency (2x / 1 yr)
Inspection Inspection Cost ($) x Inspection Frequency (6x / 1 yr)
Mowing (for some vegetative filters) Mowing Cost ($) x Mowing Frequency (4x / 1 yr)