m
m
Line 8: Line 8:
  
 
==Related pages==
 
==Related pages==
*[[Terminology for swales|Terminology for swales (grass channels)]]
+
*[[Dry swale (Grass swale)]] ([[Dry swale (grass swale) combined|+]])
*[[Overview for dry swale (grass swale)]]
+
*[[Wet swale (wetland channel)]] ([[Wet swale (wetland channel) combined|+]])
*[[BMPs for stormwater infiltration|Types of infiltration]]
+
*[[High-gradient stormwater step-pool swale]]
*[[BMPs for stormwater filtration|Types of filtration]]
 
*[[Design criteria for dry swale (grass swale)]]
 
*[[Construction specifications for dry swale (grass swale)]]
 
*[[Operation and maintenance of dry swale (grass swale)]]
 
*[[Assessing the performance of dry swale (grass swale)]]
 
*[[Calculating credits for dry swale (grass swale)]]
 
*[[Cost considerations for dry swale (grass swale)]]
 
*[[Case studies for dry swale (grass swale)]]
 
*[[Plants for swales]]
 
*[[Check dams for stormwater swales]]
 
*[[External resources for swales|External resources for dry swale (grass swale)]]
 
*[[References for dry swale (grass swale)]]
 
*[https://stormwater.pca.state.mn.us/index.php?title=Requirements,_recommendations_and_information_for_using_swale_without_an_underdrain_as_a_BMP_in_the_MIDS_calculator Requirements, recommendations and information for using dry swale (grass swale) without an underdrain in the MIDS calculator]
 
*[https://stormwater.pca.state.mn.us/index.php?title=Requirements,_recommendations_and_information_for_using_swale_with_an_underdrain_as_a_BMP_in_the_MIDS_calculator Requirements, recommendations and information for using dry swale (grass swale) with an underdrain in the MIDS calculator]
 
*[[Requirements, recommendations and information for using swale side slope as a BMP in the MIDS calculator]]
 
  
 
[[category:swale]]
 
[[category:swale]]
 
[[category:cost-benefit]]
 
[[category:cost-benefit]]
 
</noinclude>
 
</noinclude>

Revision as of 19:52, 21 May 2018

Information: The following table is generally applicable to filtration BMPs and not specifically to swales. Some items may not be applicable.

Cost estimates that site planners can use to compare the relative construction and maintenance costs for structural best management practices are excellent for purposes of comparison. However, it is recommended that construction and maintenance budgets should be based on site specific information. Utilizing the table below and cost estimation worksheets will allow designers to more accurately estimate the cost of a filtration BMP.

Cost components for filtration practices.
Link to this table

Implementation Stage Primary Cost Components Basic Cost Estimate Other Considerations
Site Preparation Tree & plant protection Protection Cost ($/acre) x Affected Area (acre) Removal of existing structures, topsoil removal and stockpiling
Topsoil salvage Salvage cost ($/acre) x Affected Area (acre)
Clearing & grubbing Clearing Cost ($/acre) x Affected Area (acre)
Site Formation Excavation / grading X-ft Depth Excavation Cost ($/acre) x Area (acre) Soil & rock fill Hauling material material, tunneling
Hauling material offsite Excavation Cost x (% of Material to be hauled away)
Structural Components Under-drains Under-drain cost ($/lineal foot) x length of device Pipes, catchbasins, manholes, valves, vaults
Vault structure (for media filters) ($/structure)
Media (for media filters) Media cost ($/cubic yard) X filter volume (cubic yard)
Inlet structure (for vegetative filters ($/structure)
Outlet structure (for vegetative filters) ($/structure)
Site Restoration Filter strip Sod cost ($/square foot) x filter strip area Tree protection, soil amendments, seed bed preparation, trails
Soil preparation Topsoil or amendment cost ($/acre) x Area (acre)
Seeding Seeding Cost ($/acre) x Seeded Area (acre)
Planting / transplanting Planting Cost ($/acre) x Planted Area (acre)
Annual Operation, Maintenance, and Inspection Debris removal Removal Cost ($/acre) x Area (acre) x Frequency (2x / 1yr) Vegetation maintenance, cleaning of structures
Sediment removal Removal Cost ($/acre) x Area (acre) x Frequency (1x / 5yr)
Gate / valve operation Operation Cost ($) x Operation Frequency (2x / 1 yr)
Inspection Inspection Cost ($) x Inspection Frequency (6x / 1 yr)
Mowing (for some vegetative filters) Mowing Cost ($) x Mowing Frequency (4x / 1 yr)



Related pages