(Created page with "<center><font size=3>'''Excerpt from Table 2575-4, Required Corrective Action'''</font size><br> Link to this table<...")
 
m
Line 1: Line 1:
<center><font size=3>'''Excerpt from Table 2575-4, Required Corrective Action'''</font size><br>
+
<font size=3>'''Excerpt from Table 2575-4, Required Corrective Action'''</font size><br>
 
+
Link to this [[Excerpt from Table 2575-4, Required Corrective Action|table]]
Link to this [[Excerpt from Table 2575-4, Required Corrective Action|table]]</center>
 
  
 
<table class="sortable">
 
<table class="sortable">
Line 9: Line 8:
 
<th>Corrective Action</th>
 
<th>Corrective Action</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Turf Reinforcement Mat</td>
 
<td>Turf Reinforcement Mat</td>
<td>Wrong TRM installed
+
<td>
Missing certificate of compliance
+
*Wrong TRM installed
 
+
*Missing certificate of compliance
Missing anchoring devices
+
*Missing anchoring devices
Insufficient anchoring devices
+
*Insufficient anchoring devices
Missing head anchor embedment
+
*Missing head anchor embedment
Missing edge anchor embedment
+
*Missing edge anchor embedment
Improper or insufficient overlap of adjoining mat units
+
*Improper or insufficient overlap of adjoining mat units
Improper soil infill depth (about 1 inch)
+
*Improper soil infill depth (about 1 inch)
Improper soil type
+
*Improper soil type
Improper hydraulic mulch RFM infill
+
*Improper hydraulic mulch RFM infill
 
+
*Wrong rolled erosion control cover
Wrong rolled erosion control cover
 
 
</td>
 
</td>
<td>Remove incorrect and replace with proper TRM
+
<td>
Cease operations and secure certificate. Else remove and replace
+
*Remove incorrect and replace with proper TRM
Install additional anchoring devices as per plan or Manufacturer
+
*Cease operations and secure certificate. Else remove and replace
Install additional anchoring devices as per plan or Manufacturer
+
*Install additional anchoring devices as per plan or Manufacturer
Entrench leading edge and anchor correctly
+
*Install additional anchoring devices as per plan or Manufacturer
Entrench side edge and anchor correctly
+
*Entrench leading edge and anchor correctly
Provide proper joints and overlaps
+
*Entrench side edge and anchor correctly
 
+
*Provide proper joints and overlaps
Apply additional screen topsoil or screed excess
+
*Apply additional screen topsoil or screed excess
Cease operations and contact OES
+
*Cease operations and contact OES
Apply additional hydraulic mulch Type RFM to manufacturer specification
+
*Apply additional hydraulic mulch Type RFM to manufacturer specification
Remove improper RECP and apply correct product
+
*Remove improper RECP and apply correct product
 
</td>
 
</td>
 
</tr>
 
</tr>
 
 
 
 
 
 
</table>
 
</table>
 
 
 
 
  
 
[[category:Table]]
 
[[category:Table]]

Revision as of 15:36, 8 November 2016

Excerpt from Table 2575-4, Required Corrective Action
Link to this table

Item Corrective Action Required if: Corrective Action
Turf Reinforcement Mat
  • Wrong TRM installed
  • Missing certificate of compliance
  • Missing anchoring devices
  • Insufficient anchoring devices
  • Missing head anchor embedment
  • Missing edge anchor embedment
  • Improper or insufficient overlap of adjoining mat units
  • Improper soil infill depth (about 1 inch)
  • Improper soil type
  • Improper hydraulic mulch RFM infill
  • Wrong rolled erosion control cover
  • Remove incorrect and replace with proper TRM
  • Cease operations and secure certificate. Else remove and replace
  • Install additional anchoring devices as per plan or Manufacturer
  • Install additional anchoring devices as per plan or Manufacturer
  • Entrench leading edge and anchor correctly
  • Entrench side edge and anchor correctly
  • Provide proper joints and overlaps
  • Apply additional screen topsoil or screed excess
  • Cease operations and contact OES
  • Apply additional hydraulic mulch Type RFM to manufacturer specification
  • Remove improper RECP and apply correct product