(Created page with " <center><font size=3>'''Infiltration basin - system construction inspection checklist'''.</font size><br> Link to this [[Media filter system - construction inspection checkl...")
 
m
Line 1: Line 1:
 
  
 
<center><font size=3>'''Infiltration basin - system construction inspection checklist'''.</font size><br>
 
<center><font size=3>'''Infiltration basin - system construction inspection checklist'''.</font size><br>
Line 93: Line 92:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<th colspan=3>3. Embankment</th>
+
<th colspan=3>3. Filter Fabric Placement</th>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Anti-seep collar or filter diaphragm per plans</td>
+
<td>Fabric per specificationss</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Fill material per specifications</td>
+
<td>Placed per plan location</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
Line 107: Line 106:
  
 
<tr>
 
<tr>
<th colspan=3>4. Final Excavation</th>
+
<th colspan=3>4. Aggregate Material</th>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Drainage area stabilized</td>
+
<td>Size as specified</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Filter material per specification</td>
+
<td>Clean / washed material</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Sediment removed from facility</td>
+
<td>Placed properly</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 +
</tr>
 +
 +
<tr>
 +
<th colspan=3>5. Observation Well</th>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Basin floor tilled</td>
+
<td>Pipe size per plans</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Facility stabilized</td>
+
<td>Under-drain installed per plans</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Removable cap / footplate per plans</td>
+
<td>Inlet installed per plans</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Initial depth = feet</td>
+
<td>Pre-treatment devices installed per plans</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
Line 146: Line 149:
  
 
<tr>
 
<tr>
<th colspan=3>5. Final Inspection</th>
+
<th colspan=3>6. Vegetation</th>
 +
</tr>
 +
<tr>
 +
<td>Complies with planting specifications</td>
 +
<td> </td>
 +
<td> </td>
 +
</tr>
 +
<tr>
 +
<td>Topsoil complies with composition and placement in specifications</td>
 +
<td> </td>
 +
<td> </td>
 +
</tr>
 +
<tr>
 +
<td>Permanent erosion control measures in place</td>
 +
<td> </td>
 +
<td> </td>
 +
</tr>
 +
<tr>
 +
<th colspan=3>7. Final Inspection</th>
 +
</tr>
 +
<tr>
 +
<td>Dimensions per plans</td>
 +
<td> </td>
 +
<td> </td>
 +
</tr>
 +
<tr>
 +
<td>Check dams operational</td>
 +
<td> </td>
 +
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Pre-treatment facility operational</td>
+
<td>Inlet / outlet operational</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Contributing watershed stabilized prior to flow diversion</td>
+
<td>Effective stand of vegetation and stabilization</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Inlet and outlet operational</td>
+
<td>Contributing watershed stabilized before flow is routed to the facility</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
Line 182: Line 213:
 
</td>
 
</td>
 
</tr>
 
</tr>
 
 
  
 
</table>
 
</table>
 
[[category:table]]
 
[[category:table]]

Revision as of 18:17, 19 March 2013

Infiltration basin - system construction inspection checklist.
Link to this table
Project:
Location:
Site Status:
Date:
Time:
Inspector:
Construction Sequence Satisfactory / Unsatisfactory Comments
1. Pre-Construction
Pre-construction meeting
Runoff diverted
Soil permeability verified
Groundwater / bedrock verified
Project benchmark established
Facility location staked out
Temporary erosion and sediment control established
2. Excavation
Size and location per plans
Side slopes stable
Depth adjusted to soil layer with specified soil type and permeability
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence
3. Filter Fabric Placement
Fabric per specificationss
Placed per plan location
4. Aggregate Material
Size as specified
Clean / washed material
Placed properly
5. Observation Well
Pipe size per plans
Under-drain installed per plans
Inlet installed per plans
Pre-treatment devices installed per plans
6. Vegetation
Complies with planting specifications
Topsoil complies with composition and placement in specifications
Permanent erosion control measures in place
7. Final Inspection
Dimensions per plans
Check dams operational
Inlet / outlet operational
Effective stand of vegetation and stabilization
Contributing watershed stabilized before flow is routed to the facility
Comments:



Actions to be taken: