m
m
Line 44: Line 44:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<tr>Mulch layer less than 3" deep: needs additional mulch</tr>
+
<td>Mulch layer less than 3" deep: needs additional mulch</td>
<tr>Yearly</tr>
+
<td>Yearly</td>
<tr> </tr>
+
<td> </td>
<tr> </tr>
+
<td> </td>
<tr> </tr>
+
<td> </td>
<tr> </tr>
+
<td> </td>
<tr> </tr>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<tr>Erosion</tr>
 
<tr>Erosion</tr>
<tr>*</tr>
+
<td>*</td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<tr>Evidence of clogging</tr>
+
<td>Evidence of clogging</td>
<tr>*</tr>
+
<td>*</td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<tr>Evidence of standing water</tr>
+
<td>Evidence of standing water</td>
<tr>*</tr>
+
<td>*</td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<tr>Weeds present</tr>
+
<td>Weeds present</td>
<tr>As needed</tr>
+
<td>As needed</td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<tr>Accumulation of sediment, debris or trash</tr>
+
<t>Accumulation of sediment, debris or trash</td>
<tr>*</tr>
+
<td>*</td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
<tr> </tr>
+
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<tr>Does drawdown time meet project requirements</tr>
+
<td>Does drawdown time meet project requirements</td>
<tr>*</tr>
+
<td>*</td>
<tr> </tr>
+
<td> </td>
<tr> </tr>
+
<td> </td>
<tr> </tr>
+
<td> </td>
<tr> </tr>
+
<td> </td>
<tr> </tr>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>

Revision as of 19:06, 24 March 2014

Maintenance inspection checklist for trees.
Link to this table
To access an Excel version of form (for field use), click here.

Erosion <t>Accumulation of sediment, debris or trash
Project Name:
Project Address:
Owner Name:
Owner Phone #:
Inspector Name:
Inspector Phone #:
Date of Inspection:
Weather at time of inspection:
Date of last rainfall prior to inspection:
Inspection item Inspection frequency Date last inspected Need to inspect during current inspection Describe signs of problems (if none, write "none") Action needed and deadline Date completed
Tree opening
Mulch layer less than 3" deep: needs additional mulch Yearly
*
Evidence of clogging *
Evidence of standing water *
Weeds present As needed
*
Does drawdown time meet project requirements *
Inlet (Curb cut at tree opening, curb cut at catch basin, porous pavement, trench drain, or other