m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
Link to this [[Media filter system - construction inspection checklist|table]]<br> | Link to this [[Media filter system - construction inspection checklist|table]]<br> | ||
To access an Excel version of form (for field use), click [[ Forms (including field inspection forms)|here]]. | To access an Excel version of form (for field use), click [[ Forms (including field inspection forms)|here]]. | ||
+ | |||
<table class="sortable"> | <table class="sortable"> | ||
<tr> | <tr> | ||
Line 185: | Line 186: | ||
<td> </td> | <td> </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td colspan=3>Comments: | <td colspan=3>Comments: | ||
− | |||
− | |||
− | |||
</td> | </td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
<td colspan=3>Actions to be taken: | <td colspan=3>Actions to be taken: | ||
− | |||
− | |||
− | |||
</td> | </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
</table> | </table> | ||
− | <noinclude>[[ | + | <noinclude> |
− | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Checklist]] | |
+ | [[Category:Level 3 - Best management practices/Structural practices/Sand filter, iron enhanced sand filter, media filter]] | ||
+ | </noinclude> |
Media filter system - construction inspection checklist.
Link to this table
To access an Excel version of form (for field use), click here.
Project: | ||
Location: | ||
Site Status: | ||
Date: | ||
Time: | ||
Inspector: | ||
Construction Sequence | Satisfactory / Unsatisfactory | Comments |
---|---|---|
1. Pre-Construction | ||
Pre-construction meeting | ||
Runoff diverted | ||
Facility area cleared | ||
Soil tested for permeability | ||
Project benchmark near site | ||
Facility location staked out | ||
Temporary erosion and sediment protection properly installed | ||
2. Excavation | ||
Side slopes stable | ||
Foundation cleared of debris | ||
Excavation does not compact subsoil, if infiltration component of design | ||
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence | ||
3. Structural Components | ||
Materials per specifications | ||
Forms adequately sized | ||
Concrete meets standards | ||
Prefabricated joints sealed | ||
Under-drains (size, materials) per specifications | ||
4. Vegetation | ||
Contributing area stabilized with vegetation and/or erosion blankets | ||
Filter material per specification | ||
Under-drains installed to grade | ||
Flow diversion structure insalled per plans | ||
Pre-treatment devices installed per plans | ||
Level overflow weirs, multiple orifices, distribution slots | ||
5. Final Inspection | ||
Dimensions per plans | ||
Surface completely level | ||
Pre-treatment device operational | ||
Structural components operational | ||
Inlet/ outlet operationall | ||
Contributing watershed stabilized before flow is diverted to the practice | ||
Comments: | ||
Actions to be taken: |