m
m
Line 10: Line 10:
 
**[https://stormwater.pca.state.mn.us/index.php?title=Soil_amendments_to_enhance_phosphorus_sorption Soil amendments to enhance phosphorus sorption]
 
**[https://stormwater.pca.state.mn.us/index.php?title=Soil_amendments_to_enhance_phosphorus_sorption Soil amendments to enhance phosphorus sorption]
 
*Soil
 
*Soil
*[[Understanding and interpreting soils and soil boring reports for infiltration BMPs]]
+
**[[Understanding and interpreting soils and soil boring reports for infiltration BMPs]]
*[[Determining soil infiltration rates]]
+
**[[Determining soil infiltration rates]]
*[[Design guidelines for soil characteristics - tree trenches and tree boxes]]
+
**[[Design guidelines for soil characteristics - tree trenches and tree boxes]]
 
*Vegetation
 
*Vegetation
 
**[[Minnesota plant lists]]
 
**[[Minnesota plant lists]]

Revision as of 20:13, 3 July 2019

Warning: This page is an edit and testing page use by the wiki authors. It is not a content page for the Manual. Information on this page may not be accurate and should not be used as guidance in managing stormwater.

Stormwater and soil, bioretention and engineered media, and media amendments


table test

Stabilization schedule must be no less than:
14 days for all exposed soils
7 days if a discharge point is within one mile of a special or impaired water
24 hours for areas within 200 ft of a public water during fish spawning times
24 hours for areas of ditches and swales within 200 ft of the property edge or surface water discharge point and 14 days for remainder