m |
m |
||
Line 10: | Line 10: | ||
**[https://stormwater.pca.state.mn.us/index.php?title=Soil_amendments_to_enhance_phosphorus_sorption Soil amendments to enhance phosphorus sorption] | **[https://stormwater.pca.state.mn.us/index.php?title=Soil_amendments_to_enhance_phosphorus_sorption Soil amendments to enhance phosphorus sorption] | ||
*Soil | *Soil | ||
− | *[[Understanding and interpreting soils and soil boring reports for infiltration BMPs]] | + | **[[Understanding and interpreting soils and soil boring reports for infiltration BMPs]] |
− | *[[Determining soil infiltration rates]] | + | **[[Determining soil infiltration rates]] |
− | *[[Design guidelines for soil characteristics - tree trenches and tree boxes]] | + | **[[Design guidelines for soil characteristics - tree trenches and tree boxes]] |
*Vegetation | *Vegetation | ||
**[[Minnesota plant lists]] | **[[Minnesota plant lists]] |
Stabilization schedule must be no less than: |
---|
14 days for all exposed soils |
7 days if a discharge point is within one mile of a special or impaired water |
24 hours for areas within 200 ft of a public water during fish spawning times |
24 hours for areas of ditches and swales within 200 ft of the property edge or surface water discharge point and 14 days for remainder |