m
m
Line 5: Line 5:
 
*Media
 
*Media
 
**Overview of bioretention and engineered media
 
**Overview of bioretention and engineered media
 +
**Bioretention and engineered media materials specifications
 
**Stormwater bioretention and engineered media mixes
 
**Stormwater bioretention and engineered media mixes
 +
**Engineered media applications for stormwater BMPs
 +
**Phosphorus leaching, export, and retention in bioretention and engineered media
 +
**Review and summary of literature pertaining to bioretention and engineered media
 
*Amendments
 
*Amendments
 
**Compost and stormwater management
 
**Compost and stormwater management

Revision as of 20:40, 3 July 2019

Warning: This page is an edit and testing page use by the wiki authors. It is not a content page for the Manual. Information on this page may not be accurate and should not be used as guidance in managing stormwater.

Stormwater and soil, bioretention and engineered media, and media amendments


table test

Stabilization schedule must be no less than:
14 days for all exposed soils
7 days if a discharge point is within one mile of a special or impaired water
24 hours for areas within 200 ft of a public water during fish spawning times
24 hours for areas of ditches and swales within 200 ft of the property edge or surface water discharge point and 14 days for remainder