(Created page with "#Required *3 foot separation from the bottom of the bioretention system to seasonal high water table *Use most restrictive infiltration rate within 3 feet of the bottom of the...")
 
m
Line 1: Line 1:
#Required
+
*Required
*3 foot separation from the bottom of the bioretention system to seasonal high water table
+
**3 foot separation from the bottom of the bioretention system to seasonal high water table
*Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
+
**Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
*Drawdown time of 24 hours for trout streams
+
**Drawdown time of 24 hours for trout streams
*For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement)
+
**For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement)
*Pretreatment
+
**Pretreatment
#Recommend
+
*Recommend
*5 acre or less for contributing area
+
**5 acre or less for contributing area
*Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin)
+
**Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin)
*Field tested infiltration rates over table values
+
**Field tested infiltration rates over table values
#Information – provide links to the following*Guidance on determining infiltration rates
+
*Information – provide links to the following*Guidance on determining infiltration rates
*Information site constraints (shallow soil, karst, etc.)
+
**Information site constraints (shallow soil, karst, etc.)
*Information on assessing BMPs
+
**Information on assessing BMPs
*Information on design metrics (high flow bypass, ponding depths, drawn down)
+
**Information on design metrics (high flow bypass, ponding depths, drawn down)
*Guidance on pretreatment
+
**Guidance on pretreatment
*Information on soil mixes
+
**Information on soil mixes
*Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance
+
**Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance
*Construction specifications
+
**Construction specifications
*Information on operation and maintenance
+
**Information on operation and maintenance
 +
 
  
 
 
*3 foot separation from the bottom of the bioretention system to seasonal high water table
 
*3 foot separation from the bottom of the bioretention system to seasonal high water table
 
*Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
 
*Use most restrictive infiltration rate within 3 feet of the bottom of the BMP

Revision as of 16:24, 6 May 2013

  • Required
    • 3 foot separation from the bottom of the bioretention system to seasonal high water table
    • Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
    • Drawdown time of 24 hours for trout streams
    • For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement)
    • Pretreatment
  • Recommend
    • 5 acre or less for contributing area
    • Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin)
    • Field tested infiltration rates over table values
  • Information – provide links to the following*Guidance on determining infiltration rates
    • Information site constraints (shallow soil, karst, etc.)
    • Information on assessing BMPs
    • Information on design metrics (high flow bypass, ponding depths, drawn down)
    • Guidance on pretreatment
    • Information on soil mixes
    • Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance
    • Construction specifications
    • Information on operation and maintenance


  • 3 foot separation from the bottom of the bioretention system to seasonal high water table
  • Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
  • Drawdown time of 24 hours for trout streams
  • For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement)
  • Pretreatment
  1. Recommend
  • 5 acre or less for contributing area
  • Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin)
  • Field tested infiltration rates over table values
  1. Information – provide links to the following
  • Guidance on determining infiltration rates
  • Information site constraints (shallow soil, karst, etc.)
  • Information on assessing BMPs
  • Information on design metrics (high flow bypass, ponding depths, drawn down)
  • Guidance on pretreatment
  • Information on soil mixes
  • Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance
  • Construction specifications
  • Information on operation and maintenance