This special page shows all uploaded files.

File list
 
First page
Previous page
Last page
Date Name Thumbnail Size Description Versions
10:57, 20 December 2017 Normal distributions.PNG (file) 135 KB   1
10:56, 20 December 2017 Normal distribution.png (file) 45 KB   1
12:51, 1 December 2017 Does facility require ISW permit.PNG (file) 145 KB   1
12:40, 1 December 2017 Checker board.PNG (file) 829 KB   1
12:59, 16 November 2017 Construction stormwater inspection checklist wq-strm2-36.docx (file) 62 KB   1
11:23, 5 October 2017 St paul phase 1.PNG (file) 956 KB   1
15:04, 31 May 2017 May 30 - 2017 generic PDH - MN Stromwater Manual- Bioretention From the Ground Up.docx (file) 17 KB   1
08:33, 21 March 2017 Bike lane st paul.JPG (file) 94 KB   1
14:49, 14 March 2017 Mar 15 - 2017 generic PDH - MN Stromwater Manual - MIDS Calculator .docx (file) 16 KB   1
09:45, 14 March 2017 Rototilling compost into the soil.PNG (file) 582 KB   1
09:40, 14 March 2017 Compost delivery to a project site.PNG (file) 905 KB   1
11:08, 13 March 2017 Rain garden used to infiltrate street runoff.PNG (file) 487 KB   1
10:49, 13 March 2017 Pervious pavers in Minneapolis.PNG (file) 474 KB   1
11:48, 8 March 2017 Bioretention facility in St Paul MN.PNG (file) 700 KB   1
11:39, 8 March 2017 Wide forested buffer protects this small stream from nearby development.PNG (file) 597 KB   1
11:10, 8 March 2017 Recommended buffer zones.PNG (file) 90 KB   1
11:04, 8 March 2017 Stream buffer.PNG (file) 797 KB   1
10:16, 2 March 2017 Typical cross-section of a tree box filter adjacent to a parking lot or roadway.PNG (file) 186 KB   1
09:59, 2 March 2017 Urban trees.PNG (file) 579 KB   1
15:52, 1 March 2017 Rainwater is filtered and stored in these large cisterns.PNG (file) 530 KB   1
15:42, 1 March 2017 Installed rain barrel.PNG (file) 852 KB   1
15:36, 1 March 2017 Wall garden to capture rooftop runoff.PNG (file) 455 KB   1
15:30, 1 March 2017 Green roof at the Philips Green Institute.PNG (file) 1.22 MB   1
15:25, 1 March 2017 Green Roof at Edgewater Condominiums Minneapolis..PNG (file) 561 KB   1
15:17, 1 March 2017 Cross-section of a typical green roof.PNG (file) 296 KB   1
16:51, 28 February 2017 Hazardous maerials storage.PNG (file) 511 KB   2
16:48, 28 February 2017 Dog waste sign.PNG (file) 438 KB   1
16:28, 28 February 2017 Typical home septic system.PNG (file) 344 KB   1
16:23, 28 February 2017 Fields of St Croix Conservation Development.PNG (file) 841 KB   1
11:05, 28 February 2017 Conventional subdivision.PNG (file) 295 KB   1
11:02, 28 February 2017 Turnaround options for residential streets.PNG (file) 63 KB   1
10:58, 28 February 2017 Sidewalk that drains to adjacent vegetation and provides common walkways linking pedestrian areas.PNG (file) 552 KB   1
10:53, 28 February 2017 Trees and vegetation in the landscape of a cul-de-sac.PNG (file) 547 KB   1
11:26, 24 February 2017 Septic system.PNG (file) 272 KB   1
10:24, 21 February 2017 Dog waste.PNG (file) 437 KB   1
10:18, 21 February 2017 Dog litter.PNG (file) 432 KB   1
16:03, 16 February 2017 Labeled stormdrain.PNG (file) 445 KB   1
15:53, 16 February 2017 Oakdale wetland program.PNG (file) 560 KB   1
15:43, 16 February 2017 Residents can bring yard waste.PNG (file) 586 KB   1
15:29, 16 February 2017 No dumping stormdrains.PNG (file) 361 KB   1
15:16, 16 February 2017 Salt shed.PNG (file) 288 KB   1
12:46, 14 February 2017 Fine tuning your winter road material management program.PNG (file) 28 KB   1
12:36, 14 February 2017 Carelessly applied fertillizer.PNG (file) 823 KB   1
12:14, 14 February 2017 No parking for street sweeping sign.PNG (file) 312 KB   1
11:54, 14 February 2017 Street sweepings can be filtered and recycled for sanding or filling.PNG (file) 458 KB   1
11:41, 14 February 2017 Car wash catch basin insert for diversion to sanitary sewer.PNG (file) 155 KB   1
11:37, 14 February 2017 Fir trucks being washed on a driveway.PNG (file) 468 KB   1
16:18, 13 February 2017 Erosion control blankets.PNG (file) 589 KB   1
15:36, 13 February 2017 New inlet protection BMPs inserted into a catch basin.PNG (file) 518 KB   1
15:20, 13 February 2017 Properly installed rock construction entrance.PNG (file) 566 KB   1
First page
Previous page
Last page

Privacy policy

Minnesota Pollution Control Agency | 651-296-6300, 800-657-3864 | Assistance | Web site policy