[[File:Technical information page image.png|100px|left|alt=image]]
This page provides a discussion of construction specifications for stormwater step po
21 KB (3,094 words) - 20:46, 27 December 2022
Click on a number in the image to link to a page with more information on the topic.
Image:Updated MPCA_Small_Site_Graphic.JPG|Image map test
7 KB (979 words) - 13:26, 17 January 2023
Eventually, this page will be redirected to the first link above.|alert-info}}
...for green roof media using the modified (DTPA)saturated paste extract (SME)test method. The ranges are for mature green roofs. Higher nitrogen levels are r
11 KB (1,611 words) - 21:39, 7 February 2023
[[File:Technical information page image.png|100px|left|alt=image]]
| Test
48 KB (6,932 words) - 01:26, 1 December 2022
This page provides information and recommendations for maximizing volume retention in
...phosphorus removal. Mixes A and B require testing and will likely fail the test.
21 KB (3,203 words) - 20:16, 1 December 2022
[[File:Technical information page image.png|100px|right|alt=image]]
This page provides guidance for operation and maintenance (O&M) of <span title="Biore
31 KB (4,328 words) - 22:25, 31 January 2023
This page provides a discussion of dissolved phosphorus in stormwater runoff, its sou
*Reactive phosphorus is the phosphorus associated with the test for orthophosphate. It consists mostly of orthophosphate but includes a sma
11 KB (1,529 words) - 21:03, 20 February 2023
[[File:Technical information page image.png|100px|left|alt=image]]
This page provides guidance for operation and maintenance (O&M) of green roofs. Green
25 KB (3,627 words) - 13:45, 30 December 2022
[[File:Technical information page image.png|right|100px|alt=image]]
...tps://en.wikipedia.org/wiki/Standard_penetration_test standard penetration test] (SPT).
11 KB (1,605 words) - 13:16, 15 February 2023
[[File:Technical information page image.png|right|100px|alt=image]]
*The location of the test should correspond to the BMP location.
13 KB (1,941 words) - 13:24, 15 February 2023
[[File:Technical information page image.png|100px|left|alt=image]]
This page provides a discussion of construction specifications for dry swales ([https
22 KB (3,332 words) - 20:46, 27 December 2022
[[File:Technical information page image.png|100px|left|alt=image]]
...rd Test Method for Infiltration Rate of In Place Pervious Concrete''. This test method can be used on porous asphalt and PICP.
19 KB (2,739 words) - 20:57, 27 December 2022
[[File:Technical information page image.png|100px|right|alt=image]]
This page provides guidance for operation and maintenance (O&M) of stormwater and rai
26 KB (3,670 words) - 17:11, 28 January 2023
[[File:Technical information page image.png|100px|right|alt=image]]
...and post-construction phase O&M, including inspection checklists, see the page called [[Operation and maintenance (O&M) of permeable pavement]].
13 KB (1,791 words) - 14:02, 30 December 2022
[[File:Technical information page image.png|100px|left|alt=image]]
*[https://minnesotawildflowers.info/page/invasive-species Invasive Plant Species in Minnesota – Minnesota Wildflow
46 KB (6,815 words) - 14:53, 7 February 2023
...iki authors. It is not a content page for the Manual. Information on this page may not be accurate and should not be used as guidance in managing stormwat
[[Main page test]]
48 KB (6,516 words) - 21:10, 10 April 2023
[[File:General information page image.png|right|100px|alt=image]]
This page provides information and guidance for <span title="A municipal separate sto
17 KB (2,612 words) - 14:21, 22 January 2023
...the [http://stormwater.pca.state.mn.us/index.php/What%27s_New What's new] page in the manual. Information on ''road salt and water quality'' can be found
...of pavement. (By increasing the size of the test area i.e., the longer the test area, the more accurate the results will be).
31 KB (4,965 words) - 20:40, 2 February 2023
[[File:Technical information page image.png|100px|left|alt=image]]
This page provides guidance for operation and maintenance (O&M) of tree trenches and
28 KB (3,985 words) - 16:12, 9 February 2023
....pca.state.mn.us/index.php/Stormwater_infiltration stormwater infiltration page].
..._facilities_with_infiltration_and.2For_recharge.29 here]. Designers should test soil at fully saturated conditions (saturated hydraulic conductivity or K<s
16 KB (2,309 words) - 13:45, 11 February 2023