The municipal separate storm sewer system (MS4) General Permit requires permittees to develop procedures and a schedule to determining the total suspended solids (TSS) and total phosphorus (TP) treatment effectiveness of all municipally owned/operated stormwater ponds (MS4 General Permit Part III.D.6.d.)