Summary of Construction Cost Data Collected
Link to this table
BMP name | Number of BMPs | Cost per | Average cost (💲) | Sample standard deviation |
---|---|---|---|---|
Bioretention Basins | 11 | Water quality volume/ft3 | 15 | 9 |
Biofiltration Basins | 2 | Water quality volume/ft3 | 58 | 61 |
Large Wet Detention Basins treating more than 100,000 ft3 | 5 | Water quality volume/ft3 | 2 | 2 |
Small Detention Basins treating less than 10,000 ft3 | 3 | Water quality volume/ft3 | 145 | 42 |
Constructed Wetlands | 4 | Water quality volume/ft3 | 1 | 1.5 |
Infiltration Trenches | 8 | Water quality volume/ft3 | 11 | 30 |
Infiltration Basins | 6 | Water quality volume/ft3 | 21 | 15 |
Underground Infiltration | 8 | Water quality volume/ft3 | 213 | 372 |
Pervious Pavement | 7 | Water quality volume/ft3 | 16 | 8 |
This page was last edited on 3 August 2022, at 20:47.