Description Unit Quantity Unit cost (dollars) Extension (dollars)
Furnish/Place Type 1 ditch liner Cubic yard 3.2 80 257.78
Ketucky Bluegrass sodding Cubic yard 1226.3 6 7.357.87
Bermuda or Zoysia sodding Square yard 1963.6 7 13,744.87
Mulch Cubic yard 25.7 30 771.40
3/8 inch gravel Cubicyard 268.5 40 10,738.73
3/4 inch gravel Cubic yard 268.5 40 10,783.73
Sand Cubic yard 268.5 25 6,711.71
Bioretention soil media Cubic yard 1073.9 50 53,693.67
MSD Type 4 geotextile Square yard 1000.7 11 11007.88
Plugs Each 1898 5 9490.00
Shrubs (#5 container or 1-gallon container) Each 30 90 2.700
Trees (2.5-inch caliper or 1-gallon container) Each 3 325 975.00