Navigation
Main page
Table of contents
Index (Categories)
What's new
Response to comments
Future updates
Events
In the News
Funding
Recent changes
Help
Export to pdf
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MPCA Links
MPCA Homepage
Stormwater
Policies / Disclaimers
Minnesota Stormwater Manual
Search Help
Log in
Search:
Search
Symbols
Symbols
A - watershed area
AB - total allowable drainage area to buffer
AC - natural area conserved
AD - area disconnected
A
r
- filter bed area
A
s
- surface area, sedimentation basin
BM
PRE
- BMP removal efficiency for total phosphorus
C - flow–weighted mean concentration of the pollutant in urban runoff
Ca - calcium
CaCl
2
- calcium chloride
Cl - chloride
CMA - calcium magnesium acetate
V
cp
-ED - extended detention of the 1–year post–development runoff
Cu - copper
DA - % Served fraction of the drainage area served by the BMP
d
f
- depth of filter bed
fc
soil
- infiltration rate
FCN - free cyanide
Fe - iron
h
f
- head above filter bed
Hg - mercury
I - impervious cover
I
a
- initial abstraction
IC - percent new impervious cover
I
post
- post–development site imperviousness
K - coefficient of permeability
KAc - potassium acetate
KFo - potassium formate
L - pollutant loading
L
post
- average annual load of total phosphorus exported from the post–development site
L
pre
- average annual load of total phosphorus exported from the site prior to development
LR - annual total phosphorus load removed by the proposed BMP
Mg - magnesium
MgCl
2
- magnesium chloride
N - nitrogen
Na - sodium
NaCl - sodium chloride
NH
3
- ammonium
NO
x
- nitrogen oxides
P - precipitation depth
P - phosphorus
P
j
- fraction of rainfall events that produce runoff
Q
f
- extreme flood storage volume
Q
i
- peak inflow discharge
Q
o
- peak outflow discharge
Q
p10
- overbank flood control storage rate
Q
p100
- extreme storm control storage rate
q
p
- water quality peak discharge
q
u
- unit peak discharge
r - volume of stormwater runoff
R
ea
- recharge area requiring treatment
R
ev
- recharge volume
RR - pollutant removal requirement
R
v
- volumetric runoff coefficient expressing fraction of rainfall that is converted to runoff
S - soil specific recharge factor
t
c
- time of concentration
t
t
- time to drain filter bed
V
cp
- channel protection volume
Vp
10
- overbank flood control storage volume
Vp
100
- extreme storm control storage volume
V
pp
- permanent pool volume
V
r
- rainfall runoff volume
V
re
- recharge volume
V
s
- snowmelt runoff volume
V
t
- total volume
V
ts
- total storage volume
V
v
- volume of voids
V
wq
- water quality volume
V
wq
ED - extended detention water quality volume
Zn - zinc
Category
:
Level 2 - General information, reference, tables, images, and archives/Reference
Search:
Search
This page was last edited on 20 July 2022, at 17:14.