m |
m |
||
Line 2: | Line 2: | ||
Link to this [[Typical winter decommission and maintenance tasks for rainwater harvesting|table]] | Link to this [[Typical winter decommission and maintenance tasks for rainwater harvesting|table]] | ||
− | <table> | + | <table class="sortable"> |
<tr> | <tr> | ||
<th>Component</th> | <th>Component</th> | ||
Line 32: | Line 32: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td>Distribution System<td> | + | <td>Distribution System</td> |
<td> | <td> | ||
*Switch end use supply from harvested water to public water supply (if necessary) | *Switch end use supply from harvested water to public water supply (if necessary) | ||
Line 40: | Line 40: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td>Overflow/Bypass Systems<td> | + | <td>Overflow/Bypass Systems</td> |
<td> | <td> | ||
*Drain and disconnect to prevent freeze/thaw damage</td> | *Drain and disconnect to prevent freeze/thaw damage</td> |
Link to this table
Component | Typical decommissioning and winter maintenance tasks needed prior to spring startup 1 |
---|---|
Source Area/Collection Surface |
|
Collection System |
|
Storage System |
|
Treatment System |
|
Distribution System |
|
Overflow/Bypass Systems |
|
This page was last edited on 3 August 2022, at 15:46.