− | ==Investigation for | + | ==Investigation for shallow bedrock areas== |
− | Geotechnical investigations are recommended for all proposed stormwater facilities located in regions with shallow bedrock and soils. The recommended approach is similar to those for karst areas. The purpose of the investigation is to identify subsurface conditions which could pose an environmental concern or a construction hazard to a proposed stormwater management practice. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project. | + | Geotechnical investigations are recommended for all proposed stormwater facilities located in regions with shallow bedrock and soils. The recommended approach is similar to those for [[Karst|karst areas]]. The purpose of the investigation is to identify subsurface conditions which could pose an environmental concern or a construction hazard to a proposed stormwater management practice. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project. |
− | ===Subsurface | + | ===Subsurface material=== |
The investigation should determine the nature and thickness of subsurface materials, including depth to bedrock and to the water table. Subsurface data may be acquired by backhoe excavation and/or soil boring. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of bedrock formations under the surface. The data listed below should be acquired under the direct supervision of a qualified geologist, geotechnical engineer, or soil scientist who is experienced in conducting such studies. Pertinent site information shall be collected which should include the following: | The investigation should determine the nature and thickness of subsurface materials, including depth to bedrock and to the water table. Subsurface data may be acquired by backhoe excavation and/or soil boring. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of bedrock formations under the surface. The data listed below should be acquired under the direct supervision of a qualified geologist, geotechnical engineer, or soil scientist who is experienced in conducting such studies. Pertinent site information shall be collected which should include the following: | ||
− | * | + | *bedrock characteristics (type, geologic contacts, faults, geologic structure, rock surface configuration); |
− | * | + | *soil characteristics (type, thickness, mapped unit); and |
− | * | + | *bedrock outcrop areas. |
− | ====Location of | + | ====Location of borings==== |
− | Borings should be located in order to provide representative area coverage of the proposed BMP facilities. The location of borings should be | + | Borings should be located in order to provide representative area coverage of the proposed BMP facilities. The location of borings should be |
− | * | + | *in each geologic unit present, as mapped by the Minnesota (MGS) and U.S. Geological Surveys (USGS) and local county records; |
− | * | + | *next to bedrock outcrop areas (e.g., within 10 feet); |
− | * | + | *near the edges and center of the proposed practice and spaced at equal distances from one another; and |
− | * | + | *near any areas identified as anomalies from any existing geophysical studies. |
− | ====Number of | + | ====Number of borings==== |
− | The | + | The number of recommended borings are described below. |
− | *Infiltration trenches, bioretention, and filters - a minimum of | + | *Infiltration trenches, bioretention, and filters - a minimum of 2 per practice. |
− | *Ponds/wetlands - a minimum of | + | *Ponds/wetlands - a minimum of 3 per practice, or 3 per acre, whichever is greater. |
*Additional borings - to define lateral extent of limiting horizons, or site specific conditions, where applicable. | *Additional borings - to define lateral extent of limiting horizons, or site specific conditions, where applicable. | ||
− | ====Depth of | + | ====Depth of borings==== |
− | Borings should be extended to a minimum depth of | + | Borings should be extended to a minimum depth of 5 feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered. |
− | ====Identification of | + | ====Identification of material==== |
All material penetrated by the boring should be identified, as follows: | All material penetrated by the boring should be identified, as follows: | ||
− | * | + | *description, logging, and sampling for the entire depth of the boring; |
− | * | + | *any stains, odors, or other indications of environmental degradation; |
− | * | + | *a minimum laboratory analysis of two soil samples, representative of the material penetrated including potential limiting horizons, with the results compared to the field descriptions; |
− | * | + | *identified characteristics should include, as a minimum: color; mineral composition; grain size, shape, and sorting; and saturation; |
− | * | + | *any indications of water saturation should be carefully logged, to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed should be provided; |
− | * | + | *water levels in all borings should be taken at the time of completion and again 24 hours after completion. The boring should remain fully open to total depth of these measurements; and |
− | * | + | *when conducting a standard penetration test (SPT), estimation of soil engineering characteristics, including “N” or estimated unconfined compressive strength. |
====Evaluation==== | ====Evaluation==== | ||
− | At least | + | At least 1 subsurface cross section through the proposed practice should be provided, showing confining layers, depth to bedrock, and water table (if encountered). It should extend through a central portion of the proposed practice, using the actual or projected boring data. A sketch map or formal construction plan indicating the location and dimension of the proposed practice and line of cross section should be included for reference, or as a base map for presentation of subsurface data. |
− | |||
− |
Bedrock and shallow soils are found in many portions of the state, but are a particular problem in the northeastern region of the state. Sites with shallow bedrock are defined for the purpose of this paper as bedrock within 6 feet or less of the ground surface. The stormwater management implications of shallow bedrock affect infiltration, ponding depths, and the use of underground practices. These sites present a host of challenges to the design engineer. However, these challenges can be managed and designed. Similar to karst, there are general guidelines to consider when designing stormwater management practices in these areas, as presented below. Special caution for steep slopes and hidden bedrock fractures is urged.
The following table provides an overview of shallow bedrock and soil related design considerations for different structural practice groups.
Recommendations for structural BMP use in settings with shallow soils and shallow depth to bedrock.
Link to this table
BMP | Shallow soil and shallow depth to bedrock considerations |
---|---|
Bioretention | Should be constructed with an underdrain or liner if minimum separation distance of three (3) feet is not present between practice bottom and bedrock.1 |
Media filter |
|
Vegetative filter |
|
Infiltration trench or basin |
|
Stormwater ponds |
|
Constructed wetlands |
|
1A liner is required under the Construction Stormwater General Permit.
Geotechnical investigations are recommended for all proposed stormwater facilities located in regions with shallow bedrock and soils. The recommended approach is similar to those for karst areas. The purpose of the investigation is to identify subsurface conditions which could pose an environmental concern or a construction hazard to a proposed stormwater management practice. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project.
The investigation should determine the nature and thickness of subsurface materials, including depth to bedrock and to the water table. Subsurface data may be acquired by backhoe excavation and/or soil boring. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of bedrock formations under the surface. The data listed below should be acquired under the direct supervision of a qualified geologist, geotechnical engineer, or soil scientist who is experienced in conducting such studies. Pertinent site information shall be collected which should include the following:
Borings should be located in order to provide representative area coverage of the proposed BMP facilities. The location of borings should be
The number of recommended borings are described below.
Borings should be extended to a minimum depth of 5 feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered.
All material penetrated by the boring should be identified, as follows:
At least 1 subsurface cross section through the proposed practice should be provided, showing confining layers, depth to bedrock, and water table (if encountered). It should extend through a central portion of the proposed practice, using the actual or projected boring data. A sketch map or formal construction plan indicating the location and dimension of the proposed practice and line of cross section should be included for reference, or as a base map for presentation of subsurface data.