m |
m |
||
(15 intermediate revisions by the same user not shown) | |||
Line 41: | Line 41: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td colspan=7>Tree opening</td> | + | <td colspan=7>'''Tree opening'''</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Mulch layer less than 3" deep: needs additional mulch</td> |
− | < | + | <td>Yearly</td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Erosion</td> |
− | < | + | <td>*</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Evidence of clogging</td> |
− | < | + | <td>*</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Evidence of standing water</td> |
− | < | + | <td>*</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Weeds present</td> |
− | < | + | <td>As needed</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Accumulation of sediment, debris or trash</td> |
− | < | + | <td>*</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Does drawdown time meet project requirements</td> |
− | < | + | <td>*</td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td colspan=7>Inlet (Curb cut at tree opening, curb cut at catch basin, porous pavement, trench drain, or other</td> | + | <td colspan=7>'''Inlet (Curb cut at tree opening, curb cut at catch basin, porous pavement, trench drain, or other)'''</td> |
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Accumulation of sediment, debris or trash</td> | ||
+ | <td>*</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Erosion</td> | ||
+ | <td>*</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td colspan=7>'''Pretreatment (curb cut at tree opening, catch basin, porous pavement, or other)'''</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Accumulation of sediment, debris or trash</td> | ||
+ | <td>*</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Erosion</td> | ||
+ | <td>*</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Evidence of clogging</td> | ||
+ | <td>*</td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Evidence of standing water</td> | ||
+ | <td>*</td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td colspan=7>'''Distribution and drainage pipes'''</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Overflow/outlet structure</td> | ||
+ | <td>*</td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td colspan=7>'''Other'''</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>*</td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>*</td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>*</td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>*</td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
</tr> | </tr> | ||
</table> | </table> | ||
+ | <font size=2> | ||
+ | NOTES: | ||
+ | *Inspect tree minimum once a month and after every major storm during first year after planting. | ||
+ | *Unless otherwise notes in "minimum inspection frequency column", inspect items below minimum spring, fall, and after major storms; adjust frequency as needed based on project conditions.</font size> | ||
− | <noinclude>[[ | + | <noinclude> |
− | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Checklist]] | |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Operation and maintenance]] | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Trees, tree trench, tree box]] | ||
+ | </noinclude> |
Maintenance inspection checklist for trees.
Link to this table
To access an Excel version of form (for field use), click here.
Project Name: | ||||||
Project Address: | ||||||
Owner Name: | ||||||
Owner Phone #: | ||||||
Inspector Name: | ||||||
Inspector Phone #: | ||||||
Date of Inspection: | ||||||
Weather at time of inspection: | ||||||
Date of last rainfall prior to inspection: | ||||||
Inspection item | Inspection frequency | Date last inspected | Need to inspect during current inspection | Describe signs of problems (if none, write "none") | Action needed and deadline | Date completed |
---|---|---|---|---|---|---|
Tree opening | ||||||
Mulch layer less than 3" deep: needs additional mulch | Yearly | |||||
Erosion | * | |||||
Evidence of clogging | * | |||||
Evidence of standing water | * | |||||
Weeds present | As needed | |||||
Accumulation of sediment, debris or trash | * | |||||
Does drawdown time meet project requirements | * | |||||
Inlet (Curb cut at tree opening, curb cut at catch basin, porous pavement, trench drain, or other) | ||||||
Accumulation of sediment, debris or trash | * | |||||
Erosion | * | |||||
Pretreatment (curb cut at tree opening, catch basin, porous pavement, or other) | ||||||
Accumulation of sediment, debris or trash | * | |||||
Erosion | * | |||||
Evidence of clogging | * | |||||
Evidence of standing water | * | |||||
Distribution and drainage pipes | ||||||
Overflow/outlet structure | * | |||||
Other | ||||||
* | ||||||
* | ||||||
* | ||||||
* |
NOTES:
This page was last edited on 24 January 2023, at 21:35.